My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04.01 October 5, 2004 Special Council Meeting Minutes
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2004
>
11-09-2004 Council Meeting
>
04.01 October 5, 2004 Special Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2016 2:44:13 PM
Creation date
7/26/2016 10:10:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pequot Lakes-Hwy 371 North <br /> October 8, 2004 <br /> Page 11 of 13 <br /> For the purposes of estimating a cost to the City, I will assume 150 feet of casing pipe <br /> will need to be installed (excavation of existing sanitary sewer, installation of a `split' <br /> casing pipe, `welding' of the `split' casing pipe, and backfilling) at $150 per foot for a <br /> total of$22,500. <br /> 34. The City is aware that it has it has watermain in a casing pipe under TH 371 at Sibley Street <br /> (the UBC corner)that will need to be extended at the City's cost as a part of this project. <br /> This watermain was installed in 1999. Due to the unknown extent and timing of the <br /> proposed TH 371 improvements at that time, the City only paid for enough casing pipe to <br /> `cover' the existing highway. <br /> For the purposes of estimating a cost to the City, and not knowing the exact highway <br /> layout at this time, I will use 75 feet of additional casing pipe (excavation of existing <br /> watermain, installation of a `split' casing pipe, `welding' of the `split' casing pipe, and <br /> backfilling) at $150 per foot for a total of$11,250. <br /> 35. The City is aware that it has a sanitary sewer lift station in the southeast corner of the <br /> intersection of TH 371 and Sibley Street. <br /> There have been some questions as to the exact location of the TH 371's R/W line in this <br /> area(if the lift station would happen to be on R/W,the City would have to relocate it at <br /> their cost—this could be in the $150,000 to $200,000 range). <br /> The City's 1999 Water System Improvement construction drawings show the lift station <br /> being off of the TH 371 R/W. However, the lift station is close and as mentioned,there <br /> have been some questions raised as to the exact location of the R/W line. <br /> The City would like to work with MnDOT's surveyors to determine in the field the exact <br /> location of their R/W, especially in this area. <br /> 36. The City is aware it has a gravity sanitary sewer about 25 feet (this is an estimated <br /> dimension)within and paralleling the east R/W line of TH 371. This gravity sanitary sewer <br /> within the R/W comes down from Front Street for about 600 feet to Sibley Street next to the <br /> UBC. <br /> We understand that MnDOT does not require non-pressure lines within their R/W to be <br /> inside casing pipes.However,we also understand that this line is in the R/W by`permit' and <br /> if MnDOT needs it relocated(not sure what feasible relocation route there is)or cased due to <br /> its highway improvements, the City will have to bear this cost. <br /> There are no known problems with the condition of this sanitary sewer. However,the <br /> CAMy DocumentsWity ClerMIGHWAY 37 hComments to MnDOT-100804-memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.