My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 - Farm Lease Agreement
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2004
>
09-07-2004 Council Meeting
>
09.01 - Farm Lease Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:08:49 PM
Creation date
7/22/2016 3:08:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Irrigation Schedule. Said irrigation system shall not interfere with the harvesting <br /> of crops on said property. The discharge of effluents through the irrigation system <br /> shall be at other times when Tulenchik is not in the process of harvesting crops, <br /> these times of harvest to be at the option of Tulenchik, commencing with July 15. <br /> The City will irrigate when requested by Tulenchik, as long as weather conditions <br /> permit, but the City reserves the right to irrigate if necessary to maintain <br /> acceptable levels of effluent in the Waste Water Treatment System ponds. <br /> 8. Plant Operator. The City shall have in its employ a Certified Operator, and <br /> said Certified Operator will have completed the necessary training as required by <br /> the Minnesota Pollution Control Agency in the Operation of the Waste Water <br /> Treatment Plant and the Center Pivot Irrigation Pivot. <br /> 9. Costs. The City shall bear all costs related to the operation of the Center Pivot <br /> Irrigation System, including but not limited to lubricants, electricity, and parts. <br /> (Witness) <br /> Cathy Malecha, Mayor Sandra Peine, City Clerk <br /> (Witness) <br /> Bill Tulenchik <br />
The URL can be used to link to this page
Your browser does not support the video tag.