Laserfiche WebLink
June 1,2004 Page 2 <br /> Pequot Lakes—Engineering Services Proposal for Morehouse Drive and Lots 7&8 <br /> contactor's means and methods, by weather, and by other factors <br /> beyond our control. <br /> Total Construction Phase: Estimated $26,300 <br /> A preliminary budget was prepared and is attached to this proposal for the proposed extension <br /> of Morehouse Drive and sanitary sewer and watermain to Lots 7 and 8. This provides the City <br /> with a general overview of potential project costs for financial planning purposes. <br /> In order to proceed with this project,we are proposing to undertake an aggressive schedule. <br /> WSN proposes to assist the City with the preliminary assessment hearing process during this <br /> month of June and then, pursuant to Council approval, prepare construction drawings and <br /> specifications for public bidding during the month of July. Bidding would occur in August and <br /> bids would be reviewed and, hopefully, approved by the Council in September. Utility <br /> construction would occur this year, with roadway items to be completed in the spring of 2005. <br /> If you are in agreement with our proposed scope of services, please sign below and return one <br /> copy of this letter to us as our authorization to proceed. We appreciate the opportunity to serve <br /> the City. <br /> Sincerely, <br /> Timothy M. Houle, P.E. <br /> Proposed by Widseth Smith Nolting <br /> Donald D. Anderson, Executive Vice President <br /> Accepted by the City of Pequot Lakes: The above proposal is satisfactory and WSN is authorized <br /> to do the work as specified. Payment will be made monthly in accordance with the terms in this <br /> proposal and on the fee schedule. <br /> Mayor Date <br /> Clerk Date <br /> C:\Documents and Settings\Administrator\Local Settings\Temporary Internet FileiContent.IE5W9FK50FQ\Pequot Lakes Morehouse Drive Extension.doc <br />