Laserfiche WebLink
Mr. Brett Twardy, Water/Wastewater Superintendent <br /> RE: Letter Agreement Between Owner and Engineer <br /> Wastewater Treatment System Assessment <br /> City of Pequot Lakes, Minnesota <br /> March 26, 2004 <br /> Page 4 of 6 <br /> The Facility Plan Report would be anticipated to include the following Sections: <br /> ■ Wastewater Treatment Flow Projections, <br /> ■ Wastewater Discharge Quality Objectives, <br /> ■ Design Standards, <br /> ■ Review of Existing Wastewater Treatment System, <br /> ■ Wastewater Treatment System Alternatives, <br /> • Preliminary Cost Estimates, <br /> ■ Discussion of Alternatives, <br /> ■ Recommendation of Proposed Alternative for Implementation, <br /> ■ Arrangements for Implementation, <br /> ■ Environmental Compliance Review. <br /> In addition to preparation of the report, AE2S will schedule strategic review meetings with <br /> appropriate City personnel during preparation of the document. Involvement of the City <br /> staff will be critical in preparing a Facility Plan that provides for the near-term needs and <br /> accommodates the long-term vision for the City of Pequot Lakes. AE2S will also present <br /> the draft document to the appropriate City Stakeholders for review and comment and <br /> revise the document as necessary. <br /> Anticipated Engineering Fees = To Be Determined (TBD)' <br /> A Facility Plan Agreement and associated Engineering fees would be negotiated <br /> pending the determination of the final Scope of Services for the project. At the <br /> time of this proposal, based on initial communications with representatives of the <br /> City, it is anticipated that Engineering fees for the comprehensive Facility Plan <br /> Report would be approximately$40,000. <br /> Approval of Task 6 would be in place of Tasks 1 through 5. Evaluation of the key issues <br /> identified in the previous tasks would be included in the completion of Task 6. <br /> Approval of Task 6 would not indicate authorization to initiate work on the project, but <br /> rather indicate support of the Facility Plan Report task. Representatives of AE2S would <br /> coordinate with Pequot Lakes staff to develop the appropriate Scope of Services and <br /> associated fees. The final Facility Plan Agreement between Owner and Engineer, <br /> including the Scope of Services and associated fees, would be presented to the City <br /> Council for approval at a future meeting. <br /> i <br /> Engineering Fees and Approval <br /> i <br /> AE2S proposes to render the aforementioned Scope of Services including Tasks 1 <br /> through 5 under this Agreement per the attached 2004 Hourly Fee and Expense Schedule <br /> (Exhibit A) on a cost plus basis to a Not to Exceed amount of nine thousand four hundred <br /> and fifty dollars ($9,450.00). If it satisfactorily sets forth your understanding of this <br /> Agreement, please initial the desired tasks in the space provided and sign and date both <br /> this original and the enclosed copy in the space provided. You should retain the original <br /> for your files and return the copy to AE2S. <br />