My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.04 - Wastewater Treatment (Spray Site) Preliminary Studies
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2004
>
04-06-2004 Council Meeting
>
10.04 - Wastewater Treatment (Spray Site) Preliminary Studies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 1:58:19 PM
Creation date
7/19/2016 1:58:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Brett Twardy, Water/Wastewater Superintendent <br /> RE: Letter Agreement Between Owner and Engineer <br /> Wastewater Treatment System Assessment <br /> City of Pequot Lakes, Minnesota <br /> March 26, 2004 <br /> Page 5 of 6 <br /> DESCRIPTION ANTICIPATED Approval <br /> FEE <br /> Task 1 Review Operating Data $ 1,800 <br /> Task 2 Research Regulatory Requirements $ 1,200 <br /> Task 3 Collect Surrounding Community Information $ 750 <br /> Task 4 Identify and Evaluate Alternatives $ 3,500 <br /> Task 5 Prepare and Present <br /> Wastewater Treatment Assessment Report $ 2,200 <br /> Total for all Tasks 1 through 5 = $ 9,450 <br /> or- -or- <br /> Task 6 Prepare and Present <br /> Wastewater Treatment Facility Plan Report $ 40,000" <br /> Determination of actual fees pending identification of final Scope of Services. <br /> Performance Schedule <br /> It is anticipated that the proposed Wastewater Treatment System Assessment Report <br /> would be completed and delivered to the City of Pequot Lakes as follows: <br /> • Draft report: Within four weeks after approval <br /> Final report: Within two weeks of draft report submittal (pending timely City <br /> feedback) <br /> It is anticipated that the proposed Wastewater Treatment System Facility Plan Report <br /> would be completed and delivered to the City of Pequot Lakes as follows: <br /> • Draft report: Within four months after approval <br /> • Final report: Within four weeks of draft report submittal (pending timely City <br /> feedback) <br /> Standard Terms and Conditions <br /> Standard Terms and Conditions are presented in the attached Exhibit B. <br /> Summary <br /> Completion of the Wastewater Treatment System Assessment will provide City officials <br /> with a concise document that includes a summary of historical operating data, projections <br /> for future wastewater treatment needs, regulatory considerations, a comparison of water <br /> supply alternatives, conceptual cost information for the alternatives, and a recommended <br /> course of action. The intent is to identify and prepare for the wastewater system <br /> improvements that will be needed to continue managing the wastewater needs of the City <br /> of Pequot Lakes residents, businesses, and institutions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.