My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WAC and SAC Fees
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
12-06-2005 Special Council Meeting
>
WAC and SAC Fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 1:28:06 PM
Creation date
7/18/2016 1:28:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12/6/2005 <br /> WAC and SAC <br /> Water: <br /> 1. Waterplant replacement / upgrade in 20 years, estimated cost <br /> today is 1-1.5 million dollars. <br /> 2. Water tower maintained and or replacement, another 5 years the <br /> painting and inspections will be $ 10,000. 20 years another tower? <br /> Cost of$150,000. <br /> Right now we have in reserve water funds approx. $ 371,000 <br /> Hookup fees would generate approx $1.2 million from future <br /> hookups reaching the max. Capacity of water system. <br /> Sewer: <br /> 1. The possibility of the existing spray irrigation site becoming a <br /> business or industrial park. <br /> 2. Cost estimate to change wastewater system to Rapid Infiltration <br /> Basins is approx. $ 1.8 million. This does not include land! <br /> 3. We are at 50% capacity for the wastewater system. <br /> `— 4. Revenue generated from future h ;; Ups would be approx. $1.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.