Laserfiche WebLink
12/6/2005 <br /> WAC and SAC <br /> Water: <br /> 1. Waterplant replacement / upgrade in 20 years, estimated cost <br /> today is 1-1.5 million dollars. <br /> 2. Water tower maintained and or replacement, another 5 years the <br /> painting and inspections will be $ 10,000. 20 years another tower? <br /> Cost of$150,000. <br /> Right now we have in reserve water funds approx. $ 371,000 <br /> Hookup fees would generate approx $1.2 million from future <br /> hookups reaching the max. Capacity of water system. <br /> Sewer: <br /> 1. The possibility of the existing spray irrigation site becoming a <br /> business or industrial park. <br /> 2. Cost estimate to change wastewater system to Rapid Infiltration <br /> Basins is approx. $ 1.8 million. This does not include land! <br /> 3. We are at 50% capacity for the wastewater system. <br /> `— 4. Revenue generated from future h ;; Ups would be approx. $1.8 <br />