My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - Engineer's Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
09-06-2005 Council Meeting
>
13 - Engineer's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 3:21:08 PM
Creation date
7/15/2016 3:21:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Potential City of Pequot Lakes Costs <br /> TH 371 Improvements <br /> August 22,2005 <br /> Segment Item Number Description Cost Item Estimated City Cost' <br /> Lake-Woodman 34 West side service road Right-of-Way $100,000 <br /> Upgrade to curb&gutter from 32-foot wide $25,000 <br /> Woodman-Jokela 35 Various accesses within urban core $0 <br /> 36 Possible relocation of CSAH 11 Start mapping Right-of-Way needed for realignment-not part of this project $0 <br /> 37 Seed limit $0 <br /> 38 Pedestrian crossing safety Pedestrian tunnel $500,000 <br /> 39 TH 371 aesthetics Lighting $10,000 <br /> Stamped cobblestone medians/crosswalks $10,000 <br /> Sidewalks $10,000 <br /> Landscaping $10,000 <br /> 40 Watenmain cr ssing at CSAH 11/Main Street Replace watennain and put in a casing $50,000 <br /> 41 Sanitary sewer crossing at Sibley Street Replace sanitary sewer and put in a casing $50,000 <br /> 42 Watermain crossing at Sibley Street Extend Casing $12,000 <br /> 43 Lift station at Sibley Street possibly within MnDOT Right-of-Way Possibly relocate lift station out of Right-of-Way $200,000 <br /> 44 Sanitary sewer within MnDOT Right-of-Way from Front Street to East Sibley Street Put sanitary sewer that is parallel to roadway in a casing or relocate $100,000 <br /> 45 Watenmain within MnDOT Right-of-Way from Front Street to East Sibley Street Put watermain that is parallel to roadway in a casing(or relocate) $100,000 <br /> Jokela-Jenkins 46 MnDOT stormwater drainage system including capacity for future City storm sewers City participation in expanded MnDOT storm water drainage system $50,000 <br /> 47 CSAH 17/Front Street intersection on curve $0 <br /> 48 Access to/from Langenbaugh property Possible acquisition of property for City"green space" $400,000 <br /> Total Estimated Potential City Costs $4,994,700 <br /> NOTE that priorities need to be continually worked on and the above numbers continually recalculated[ <br /> CMocurnents and SeuingsVAdnninistrat&Local Settings\Temporary Internet FilesWLKBIPotential City Costs.xis <br /> Page 2 of 2 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.