My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - City Engineer Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
08-02-2005 Council Meeting
>
13 - City Engineer Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 1:47:57 PM
Creation date
7/15/2016 1:47:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 29, 2005 Page 7 of 8 <br /> Pequot Lakes <br /> Government Drive Proposal <br /> VIII. Funding <br /> Even if special assessments are used, we anticipate that the City will need <br /> to bond for these improvements. <br /> The opinions of probable construction cost that we prepare as part of our $0 <br /> above tasks normally suffice for the City's funding consultants. <br /> If additional information requests are required, these would be treated as <br /> additional work and the scope would be determined once these requests <br /> are known. <br /> IX. Bidding <br /> Prepare an Advertisement for Bids and submit to the Construction Bulletin, <br /> the Echo Newspaper, and the Brainerd Daily Dispatch Newspaper. <br /> Issue Contract Documents to bidders, address bidders' questions, issue $2,900 <br /> addenda as required, attend the bid opening, and prepare a tabulation of <br /> bids and a recommendation of award. <br /> `.• City is to pay any advertisement costs. <br /> Total Through Bidding: Lump Sum $71,500 <br /> X. Construction Phase <br /> Provide for construction staking, on-site observation, and construction <br /> contract administration. <br /> This is based on a 7-week long construction schedule, beginning right after <br /> Labor Day 2006. <br /> Our cost for this phase is estimated because our efforts can be impacted <br /> by the construction contactor's means and methods, by weather, and by <br /> other factors beyond our control. <br /> If the City desires conformed to construction record drawings, this would be <br /> treated as additional work and we would provide an estimate of our effort if <br /> requested. <br /> Total Construction Phase: Estimated $35,000 <br /> CADocuments and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\Government Drive proposal-July 29 <br /> 2005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.