Laserfiche WebLink
July 29, 2005 Page 8 of 8 <br /> Pequot Lakes <br /> Government Drive Proposal <br /> In order to proceed with this project, we are proposing the following schedule: <br /> Survey, storm drainage preliminary design, feasibility report, preliminary assessment <br /> notices and hearing, and soil borings, to occur during the latter part of 2005. <br /> Final design will occur during the fall/winter of 2005. <br /> Land acquisition would occur during the winter of 2005-2006. <br /> Bidding would occur during the spring of 2006. <br /> Construction would be held off until after Labor Day of 2006 with restoration work to <br /> possibly occur in 2007. <br /> If special assessments were used, we would anticipate the final notices and hearing <br /> would occur towards the end of 2006. <br /> If you are in agreement with our proposed scope of services, please sign below and return one <br /> copy of this letter to us as our authorization to proceed. We appreciate the opportunity to serve <br /> the City. <br /> WIDSETH SMITH NOLTING <br /> Timothy M. Houle, P.E. <br /> .............................................................................................................. <br /> Proposed by Widseth Smith Nolting: <br /> Donald D. Anderson, Executive Vice President <br /> Accepted by the City of Pequot Lakes: <br /> The above proposal and attached General Provisions of Professional Services are satisfactory <br /> and WSN is authorized to do the work as specified in this proposal. Payment will be made <br /> monthly in accordance with the terms in this proposal and on the attached fee schedule. <br /> Mayor Date <br /> Clerk Date <br /> CADocuments and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\Govemment Drive proposal-July 29 <br /> 2005.doc <br />