Laserfiche WebLink
July 29, 2005 Page 4 of 8 <br /> Pequot Lakes <br /> Government Drive Proposal <br /> WSN proposes the following scope of services for completing the above anticipated <br /> improvements: <br /> Tasks Amount <br /> I. Field Survey& Utility Locations <br /> After appropriate office research, a field survey will be completed to provide <br /> topographical information as well as utility locations. $14,400 <br /> This survey will need to extend outside Government Drive itself to obtain <br /> information that will relate to the storm drainage system design. <br /> II. Storm Drainage Preliminary Design <br /> Layout a preliminary storm drainage collection system along with <br /> appropriate discharge/infiltration basin locations. <br /> Perform a preliminary hydrologic and hydraulic design for a 5-year design <br /> storm. Check overflow routes and basin design for a 100-year design <br /> storm. <br /> Assist the City in determining possible locations, volumes needed, and <br /> resulting areas/properties required for the infiltration basins. <br /> This design will account for initial flow from the Government Drive corridor $7,600 <br /> and include a masterplan component to review flow from County Road 112 <br /> back to Government Drive. <br /> Estimate the costs of the collection system and the infiltration basins. <br /> Send this preliminary design to the Minnesota Department of <br /> Transportation (MnDOT)for possible coordination with their storm sewer <br /> system for the proposed 4-lane TH 371 improvements. <br /> Any adjustments to this initial design from MnDOT's comments would be <br /> treated as additional work and its scope would be determined once <br /> MnDOT's comments were received. <br /> CADocuments and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\Government Drive proposal-July 29 <br /> 2005.doc <br />