My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - City Engineer Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
08-02-2005 Council Meeting
>
13 - City Engineer Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 1:47:57 PM
Creation date
7/15/2016 1:47:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 29, 2005 Page 3 of 8 <br /> Pequot Lakes <br /> Government Drive Proposal <br /> 5. There will be diagonal parking on both sides of the through lanes. <br /> Diagonal parking limits the crossing movements of 90-degree parking and will hopefully <br /> provide for the possibility of smoother and safer traffic flow along Government Drive. <br /> Costs to be paid for from a combination of special assessments to the abutting property <br /> owners and from the City Street budget. <br /> 6. Concrete curb and gutter will be placed on the east side. <br /> Concrete curb and gutter will also be placed on the west side with (flume)openings as <br /> needed for stormwater to flow into the proposed grassed swales. <br /> Costs to be paid for from a combination of special assessments to the abutting property <br /> owners and from the City Street budget. <br /> 7. There will be a concrete sidewalk, roughly the same width as present, on the east side <br /> between the buildings and the concrete curb and gutter. <br /> There will be no sidewalk on the west side. However, with the Paul Bunyan Trail on this <br /> side, there will be periodic"crossings"from the parking pavement to the Trail. <br /> Costs to be paid for from a combination of special assessments to the abutting property <br /> owners and from the City Street budget. <br /> 8. Regarding aesthetic and decorative improvements, such improvements will have to be <br /> coordinated with and fit with the rest of the improvements. <br /> For example, the anticipated storm drainage swales on the west side will not fit with the <br /> existing wooden rail fencing. <br /> Sidewalk widths would have to work with possible light poles, benches, and planters <br /> while somehow meshing with each property's storefront look (awnings, color scheme, <br /> etc.). <br /> If light poles were put on the sidewalk, conduit has to be properly located. <br /> Considering all of the above, these improvements will not initially include aesthetic and <br /> decorative features. <br /> It is anticipated such features would be incorporated on the west side of the corridor to <br /> coordinate with the Trailside Park while not "clashing"with individual storefronts. <br /> Any costs (if there were any)would be paid for from the City Park budget/fund. <br /> CADocuments and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\Govemment Drive proposal-July 29 <br /> 2005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.