My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07.08 - Trailside Estates
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
09-05-2006 Council Meeting
>
07.08 - Trailside Estates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 8:40:47 AM
Creation date
7/8/2016 8:40:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WIDSETH <br /> SMITH <br /> MEMO rj LE NG <br /> Date: September 5, 2006 <br /> To: Honorable Mayor, Council, and Staff-City of Pequot Lakes <br /> From: Mike Rude and Tim Houle <br /> Cc: WSN File <br /> Project Name: Trailside Estates <br /> Project No.: 0130B0000 <br /> Subject: Draft Developer's Agreement -Engineering Costs <br /> In regards to the one-page draft Developer's Agreement for Trailside Estates, there was a request <br /> for us to estimate our time/engineering costs described therein. <br /> Under the paragraph heading "The developer shall be responsible for the following:" <br /> Item 4. All costs for the City Engineer to review the construction drawings, specifications <br /> (using City Engineers Association of MN and MnDOT specifications) and a unit price/line <br /> item cost estimate prior to the developer selecting a contractor and moving forward with <br /> construction. <br /> We estimate the cost for this item to be approximately$1,700. <br /> Item 5. All costs for the City Engineer to observe the construction. <br /> For the purpose of this estimate, we have assumed a 6-week construction period. <br /> This may vary substantially depending on the contractor selected and the <br /> contractor's schedule. <br /> Based on this 6-week construction period, we estimate the costs for this item to be <br /> approximately$22,900 if full-time observation is desired(which is what Brett Twardy <br /> recommended) or$5,400 if part-time observation is desired. <br /> Item 6. All costs for any consultant the City may need to contact, with developers consent. <br /> We do not have an estimate of our time%ffort on this item until its scope is better <br /> defined. <br /> We hope that these estimates are helpful in your discussions on this project. Should you need any <br /> further information or explanation of these estimated, please do not hesitate to contact either of us <br /> at your convenience. <br /> L <br /> J:\130PQLAK\0000-General\CORRESPONDENCE\Mayor,Council,and Staff-Trailside Estates Engineering Estimates-090106.doc <br /> 7804 Industrial Park Road■PO Box 2720■ Baxter,MN 56425-2720■TEL:218.829.51 17-FAX:218.829.2517■WEB:www.wsn-mn.com <br /> ENGINEERING ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES AA/EEC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.