Laserfiche WebLink
June 28, 2006 Page 2 of 2 <br /> Pequot Lakes <br /> NE Sanitary Sewer Extensions Proposal <br /> Construction Phase Staking <br /> Construction staking and administration. Assuming one trip to <br /> establish local control and one trip to provide construction stakes for <br /> project. This schedule can be impacted by contactor's means and <br /> methods, by weather, and by other factors beyond our control. $2,200 <br /> Construction Phase Observation <br /> Construction observation and administration; assuming 2 weeks of <br /> construction. This schedule can be impacted by contactor's means <br /> and methods, by weather, and by other factors beyond our control. $8,100 <br /> Total Construction Phase: Estimated 1 $10,300 <br /> A preliminary cost estimate was prepared and is attached to this proposal for the proposed <br /> extension of sanitary sewer. This provides the City with a general overview of potential project <br /> costs for financial planning purposes. <br /> WSN will complete the plans and specifications for this project within 60 days of authorization by <br /> the City. <br /> If you are in agreement with our proposed scope of services, please sign below and return one <br /> copy of this letter to us as our authorization to proceed. We appreciate the opportunity to serve <br /> the City. <br /> Sincerely, <br /> Timothy M. Houle, P.E. <br /> .............................................................................................................. <br /> Proposed by Widseth Smith Nolting <br /> Donald D. Anderson, Executive Vice President <br /> Accepted by the City of Pequot Lakes: The above proposal is satisfactory and WSN is <br /> authorized to do the work as specified. Payment will be made monthly in accordance with the <br /> terms in this proposal and on the fee schedule. <br /> Mayor Date <br /> Clerk Date <br /> C:\My Documents\City Clerk\Council Meetings\2006 CC Agenda Items\070506\Pequot Lakes-NE Sewer Extension-Proposal- <br /> 062806.doc <br />