Laserfiche WebLink
Page 1 of 1 <br /> brett twardy <br /> From: 'Tim Houk"<thouW@wsn-mn.com> <br /> To: <clnwtr@tds.net> <br /> Cc: <"Mike Rude"Qsmtp2.onvoy.com> <br /> Sent: Thursday,June 01,2006 2:02 PM <br /> Subject: Pequot Lakes-Sanitary Sewer <br /> Brett, <br /> In response to your phone call request this afternoon,here are some <br /> numbers: <br /> +$25 per foot for 400 feet of sanitary sewer pipe in place=$10,000 <br /> +$2,000 for one manhole=$2,000 <br /> +$200 each for 4 wyes=$800 <br /> +$20 per foot for 100 feet of service pipe=$2,000 <br /> +$1,000 each for connect(core drill,etc.)to existing manhole in CR 112= <br /> $1,000 <br /> •Repave around existing MH in CR 112=$5,000 <br /> •Topsoil and turf re-establishment=$3,000 <br /> •Mobilization=$2,500 <br /> Estimated Construction Total=$26,300 <br /> Timothy M.Houle,P.E. <br /> Civil Engineer,Vice President <br /> Widseth Smith Nolting <br /> 7804 Industrial Park Road <br /> Baxter,MN 56425-2720 <br /> Direct: 218.316.3646 <br /> Cell:218.820.6590 <br /> Office:218.829.5117 <br /> Fax:218.829.2517 <br /> Email: thoulc(@,wsn-mn.com <br /> 62/06 <br />