My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04 - Rate Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2007
>
10-16-2007 Council Meeting
>
04 - Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 2:41:23 PM
Creation date
6/27/2016 2:41:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Costs are inflated 3%annually. Costs are inflated 3%annually. The <br /> The total in today's dollars for 2008 total in 2007 dollars from 2008 <br /> through 2023 is$1,068,500 through 2023 is$3,069,500 <br /> Allocation of Capital improvements needed to Capital improvements needed to <br /> Capital finance water system improvements expand the waste water treatment <br /> Expenses are paid by a combination of hook- plant are paid by a combination of <br /> Between up fees and user fees. Capital hook-up fees and user fees. <br /> equipment and maintenance of the <br /> Current and Capital equipment and maintenance <br /> Future Users existing system is paid by user of the existing system is paid by user <br /> charges. <br /> charges. <br /> After deducting the credit for the After deducting the credit for the <br /> developer,as described in#2 of the developer,as described in#2 of the <br /> Findings section below, Findings section below, <br /> approximately$12,990 in hook up approximately$274,000 in hook up <br /> fees are available to pay for fees are available to pay for <br /> $860,000 of costs of improvements $2,865,000 of costs of improvements <br /> to the water distribution system, to the sanitary sewer system,which <br /> which includes the improvements to includes the improvements to the <br /> the Industrial Park. Industrial Park and the waste water <br /> The study includes a special treatment facility. <br /> assessment component for the The study includes a special <br /> Industrial Park,which is consistent assessment component for the <br /> with the financing for phase I of the Industrial Park,which is consistent <br /> Park. with the financing for phase I of the <br /> Park. <br /> L <br /> See Exhibit C for the proposed See Exhibit C for the proposed <br /> schedule of capital projects schedule of capital projects <br /> Operating Expenses increase 5%annually. Expenses increase 5%annually. <br /> Expenses <br /> Water Utility and Sanitary Sewer Utility <br /> Funding Ideally, a City would fully fund depreciation in its utility funds. However, <br /> Replacement when a City is growing and investing in new infrastructure it can be cost <br /> Reserves prohibitive to customers to simultaneously expand the system and fund its <br /> replacement. The growth of 45 new homes represents a 20%increase in the <br /> number of residential users being served by the system. <br /> The replacement reserves have been calculated at 90 days of operating <br /> expenses,plus 100%of next year's debt service,plus 100%of the current <br /> year's equipment purchases,plus 50%of the current year's depreciation. If <br /> depreciation,which is a non cash expenditure,were removed from the <br /> calculation,the water fund would meet its..capital reserve. However,the <br /> 3060 Centre Pointe Drive (651)697-8500 Fax:(651)697-8555 <br /> Roseville,MN 55113-1105 http://www.ehlers-inc.com <br /> 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.