My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 - P&Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2007
>
10-18-2007 Planning Commission Meeting
>
9 - P&Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 11:56:14 AM
Creation date
6/15/2016 11:56:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City of Pequot Lakes requests that two of the trees recently planted in the right-of-way be <br /> moved. They are the first tree located north of the stop sign at the Trailside Loop and Trailside <br /> Road intersection and the first tree located west of the stop sign at the Trailside Road and County <br /> Road#112 intersection. <br /> In the area of this first tree mentioned above as well as across the street of Trailside Loop(Paul <br /> Circle),please fill up against the back of the curb and gutter with earth. <br /> The City of Pequot Lakes has concern with sediment that is washing onto the roadway and filling <br /> the curb line,particularly in the northwest corner of the development. They are requesting that <br /> silt fence is installed behind the curb in these wash-out areas until turf is fully established. <br /> If you have any questions or concerns regarding this please feel free to contact me or Will Hoyt <br /> at 568-4940. <br /> Sincerely, <br /> Landecker&Associates,Inc. <br /> Bryan G. Drown, PE <br /> Cc: City of Pequot Lakes <br /> Tim Houle—City Engineer, Widseth, Smith,&Nolting(via e-mail) <br /> 061350 <br /> i <br /> i <br /> i <br /> i <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.