My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 - P&Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2007
>
10-18-2007 Planning Commission Meeting
>
9 - P&Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 11:56:14 AM
Creation date
6/15/2016 11:56:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-� Item 3—Constructing ditching around the northwest cul-de-sac <br /> It is acceptable to leave this area as presently constructed. Please note that as driveways are <br /> constructed,care shall be taken so that run-off does not pond against the edge of the pavement <br /> and create future erosion problems. <br /> Item 4—Construct by-pass lane on County Road#112 <br /> 1. All power poles adjacent to the bypass lane need to be re-located to the right-of-way. <br /> 2. The by-pass lane needs to have striping placed. <br /> 3. A roadside ditch,while shallow,needs to be constructed along the bypass lane,as well as <br /> the ditch north of the bypass lane needs to be stabilized and turf established. <br /> Item 5—Remove and replace cracked concrete curb and cutter sections as noted <br /> The City of Pequot Lakes will allow the saw-cutting of the cracks and filling with the Sealtight <br /> Futura— 15,but reserves the right to comment on its suitability at each location after these <br /> repairs have been made. <br /> Item 6—Remove and replace 15 feet of concrete curb and gutter north of CB 4 to provide <br /> positive drainage to the catch basin <br /> In reviewing this are after the recent rain events, it is evident from the sediment deposits and <br /> i puddles in the curb line that catch basin 4, CB-4,(inside edge of the loop) is set higher than the <br /> adjacent flow lines. This ponding of water,while maybe not great to you, will be an eventual <br /> and continuing maintenance issue for the City. Curb and gutter on each side of the catch basin <br /> needs to be removed and replaced to provide positive drainage to the catch basin. <br /> It is also evident that the curb line south of CB-3 (outside edge of the loop)has settled and does <br /> not have positive drainage to the catch basin. Approximately 27 feet of concrete curb and gutter <br /> in this area needs to be removed and replaced such that it drains to CB-3. <br /> Please let us know your plan to remove and replace this curb and gutter and whether it will <br /> involve removal of any pavement. i <br /> Item 8 -Install 15" GS apron and remove sediment from sum area(Trailside Loop Sta <br /> 0+28) <br /> It is acceptable to not require installation of the GS apron in lieu of the rip-rap apron that was <br /> installed. <br /> Item 11—Construct rip-rap channel at station 10+00 left <br /> This has been constructed. We request that the area adjacent to Trailside Road east of the <br /> spillway be re-graded such that the shoulder slopes away from the bituminous. <br /> Item 15—Verify drainage on the northwest side of the south cul-de-sac(station 6+75) <br /> We have verified that the bituminous in the cul-de-sac drains to the catch basin. <br /> 1 <br /> In your letter you asked for a completion date for the playground equipment. The City has <br /> received the equipment and will be installing it this fall,but does not have a firm date at this I <br /> L.- time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.