Laserfiche WebLink
11!S Landecker 8z- Associates, ]["C- 4646 County Rd.11•P.O.Box 120•Pequot Lakes,MN 56472 <br /> Engineering• Surveying• Planning 218-568-4940.888-866-4940-Fax:218-568-5404 <br /> www.landecker.com <br /> September 24, 2007 <br /> Carl Smith <br /> Car-Col Construction <br /> 19513 State Highway No. 371 <br /> Brainerd, MN 56401 <br /> RE: Punch List of Construction Items Remaining-Trailside Estates <br /> 4 <br /> Dear Corky, <br /> We have reviewed your letter to the City of Pequot Lakes dated September 13,2007 with the <br /> City Engineer and Public Works Department regarding the remaining punch list items and have <br /> the following comments. <br /> i <br /> Item 1 —Televising of sanitary sewer mains <br /> • Tapes of the televising and a written report have been provided to the City of Pequot <br /> Lakes. When reviewing the tapes the following items were discovered. ' <br /> 1. A slip joint 239' south of manhole 3 is not connected correctly. Please see <br /> attached photo. This needs to be excavated and repaired. <br /> 2. Sediment is building up at the 2—45 degree bends set vertically between manhole <br /> 6 and the lift station. The City is requesting that these bends are removed and the <br /> sanitary sewer extended directly into the lift station. This will require re- <br /> installing approximately 15 feet of 8"sanitary sewer main, coring a new invert in <br /> the lift station,and grouting shut the existing invert. <br /> 3. When taking care of No. 2 above,the rock retaining wall next to the lift station <br /> wet well top slab and control panel will be removed. The City is concerned about I <br /> getting across the rocks that may be slippery or icy at times. When restoring this <br /> area, install stairs or a reasonably sloped access path so they do not have to climb <br /> over this rock retaining wall to access these areas. <br /> 4. The sewer main between manhole 6 and the lift station needs to be cleaned out. <br /> The lift station needs to be pumped out and sediment removed from the bottom. <br /> 5. There is sediment in manhole 4 and in the line approximately 5 feet upstream of <br /> manhole 4 that needs to be removed. <br /> 6. There are six bumps into the pipe noted in the video. The bumps were apparently <br /> not of the size that would prevent the mandrel from getting through. We are <br /> guessing that your crews did not keep all the rocks away from the pipe during <br /> backfill. We believe that the pipe's integrity has not been comprised. However, <br /> one of these bumps is in the invert,and has the potential over time to be a <br /> maintenance issue. This needs to be excavated and repaired. <br />