Laserfiche WebLink
Crow Wing County Zoning Ordinance <br /> Part III—Development Standards <br /> I. To scale drawing. All site designs must be drawn to scale to fit on an 8.5 x 11 inch sheet of <br /> paper with the exception of Planned Unit Developments and Plats. <br /> J. Property identified. The property real estate code and legal description must be on the design <br /> application to be complete. <br /> K Required design sheet. All designs must be submitted on Crow Wing County design sheets. <br /> L. New system tank sizing. Sewage must pass through a minimum of three baffles before <br /> reaching either a lift tank or the drain field. This may be accomplished either through a <br /> compartmentalized septic tank of a minimum of one thousand five hundred(1500)gallons or <br /> multiple tanks with no tank having less than one thousand(1000)gallon capacity.An affluent <br /> may be substituted for a baffle. The filter must be of such a design that when the filter is <br /> removed from the filter housing,the flow of water from the tank is not allowed. <br /> M. Bedroom Additions and Variances. Undersized and failing sewage treatment systems shall <br /> be upgraded to equal daily flow changes created by any bedroom changes prior to issuing a <br /> permit or variance. <br /> N. Soil Pits. Shall be required,but not limited to one pit for all treatment areas. The soil pit <br /> shall be excavated at the time of the septic inspection. The soil pit shall be excavated to a <br /> depth that will allow the verification of redoximorphic features and the three foot separation <br /> as required by MPCA 7080(conform to OSHA confined space requirements) Location of soil <br /> pits shall be adjacent the lowest trench or next to the down slope side of an elevated treatment <br /> area. The pit shall not impact the hydraulic performance of the ISTS. <br /> 37.6 OTHER ESTABLISHMENTS AND PERFORMANCE SYSTEMS <br /> A. Tests required. Biological Oxygen Demand(BOD),Total Suspended Solids(TSS),and Fat <br /> Oil Grease(FOG)testing is mandatory for all`Other Establishments',and`Performance' <br /> systems. The test samples must be taken at a point between the effluent end of the tank and <br /> the treatment area. An access for taking a sample must be provided. Test samples shall be <br /> �. taken within eighteen(18)hours after maximum flows. <br /> B. Other and Performance systems. These systems must be accompanied by a complete <br /> monitoring and mitigation plan specifying,but not limited to the following:An outline of the <br /> system,indicating/showing what will be monitored,testing frequency,how the results will be <br /> disseminated,and who will be responsible for replacement should the system fail,and a time <br /> frame for repair. <br /> 37.7 FAILED SEPTIC SYSTEMS <br /> A. Failed systems must be replaced. A failed septic system shall be upgraded,replaced or <br /> repaired in compliance with Minnesota Rules Chapter 7080.0060,as applicable within ten <br /> months from the date it was determined to be failed as documented on the MPCA compliance <br /> form. <br /> B. Replacement design.The owner(s)shall submit to the Planning and Zoning Department an <br /> acceptable replacement design and apply for a septic permit within thirty(30)days after <br /> notification by the Department. The replacement design shall identify the location and design <br /> of the septic system and a schedule for its replacement. Failure to submit and execute an <br /> acceptable replacement design is a violation of this ordinance. <br /> 37.8 INSPECTION PROCEDURES AND REQUIREMENTS <br /> A. Notice prior to covering. The installer shall notify the Planning and Zoning Office a <br /> minimum of twenty-four(24)hours before the covering any portion of the construction work. <br /> CHANGES FROM THE APPROVED SEPTIC DESIGN WILL REQUIRE APPROVAL BY <br /> THE COUNTY PRIOR TO CONSTRUCTION. . <br /> B. Reasonable response to notice. If the installer provides proper notice and the inspector does <br /> not provide an inspection within one(1)hour after an inspection time was set,the installer <br /> Part III Page 61 <br />