My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 15-16
Laserfiche
>
City Council (Permanent)
>
Resolutions
>
2015
>
Resolution 15-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2016 9:08:13 AM
Creation date
5/5/2016 9:08:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MnDOT Contract No: 1000645 <br /> including,without limitation,the following clauses: 3.Maintenance by the City;8. Liability;Worker <br /> Compensation Claims; 10.State Audits; 11.Government Data Practices; 12.Governing Law;Jurisdiction; <br /> Venue;and 14.Force Majeure. The terms and conditions set forth in Article 4. Signal System and EVP <br /> System Operation and Maintenance will survive the expiration of this Agreement, but may be terminated by <br /> another Agreement between the parties. <br /> 2. Construction by the State <br /> 2.1. Contract Arvartl. The State will advertise for technical and price proposals and award a design-build <br /> contract to the"Best Value Proposer" for State Project No. 1810-92(T.H.371=019)according to the State <br /> Request for Qualifications(RFQ)and Request for Proposal(RFP)documents,which are on file in the office <br /> of the Commissioner of Transportation at St. Paul,Minnesota,and incorporated into this Agreement by <br /> reference. <br /> 2.2. Direction,Supervision and Inspection of Construction. <br /> A. Supervision and Inspection by the State. The State will direct and supervise all design-build activities <br /> performed under the design-build contract,and oversee all construction engineering and inspection <br /> functions in connection with the design-build contract construction. All design-build construction will <br /> be performed according to the State's Request for Proposals, the Contractor's technical proposal,and <br /> approved plans. <br /> B. Inspection by the City.The City participation construction covered under this Agreement will be open to <br /> inspection by the City. if the City believes the City participation construction covered under this <br /> Agreement has not been properly performed or that the construction is defective, the City will inform the <br /> State District Engineer's authorized representative in writing of those defects. Any recommendations <br /> made by the City are not binding on the State. The State will have the exclusive right to determine <br /> whether the State's contractor has satisfactorily performed the City participation construction covered. <br /> under this Agreement. <br /> 2.3. flan Changes,Additional Construction,Etc. <br /> A. The State may request the Contractor to make changes in the design and/or contract construction,which <br /> may include the City participation construction covered under this Agreement,and will enter into any <br /> necessary addenda,change orders and supplemental agreements with the State's contractor that are <br /> necessary to cause the design-build contract construction to be performed and completed in a satisfactory <br /> manner. The State District Engineer's authorized representative will inform the appropriate City official <br /> of any proposed addenda,change orders and supplemental agreements to the design-build contract that <br /> will affect the City participation construction covered under this Agreement. <br /> B. The City may request additional work or changes to the work in the plans as part of the design-build <br /> contract. Such request will be made by an exchange of letter(s)with the State. if the State determines <br /> that the requested additional work or plan changes are necessary or desirable and can be accommodated <br /> without undue disruption to the project,the State will cause the additional work or plan changes to be <br /> made. <br /> C. The State reserves the right to invoice the City for the cost of any additional City requested work and <br /> plan changes,design-build contract addenda,change orders and supplemental agreements,and <br /> associated design and construction engineering delivery costs before the completion of the contract <br /> construction. If the design and construction engineering delivery costs are not included in any change <br /> order or work order estimates,the amount will be added to the City's/Coutity's estimate of costs. <br /> 2.4. Satisjtnctor1,Complelion of Contract. The State will perform all other acts and functions necessary to cause <br /> the design-build contract to be completed in a satisfactory manner. Acceptance by the State of the <br /> completed design-build contract construction will be final,binding and conclusive upon the City as to the <br /> satisfactory completion of the design-build contract construction. <br /> -2- <br /> Design-Build Lump Sum(Municipal Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.