My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
07-18-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2016 8:49:51 AM
Creation date
4/26/2016 8:49:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pillsbury St. north to East/West Grove Street <br /> �— There is an enormous amount of develop potential in this area of the City. In the past, <br /> the Planning Commission has looked at the vast amount of vacant space that is <br /> developable along this section of the highway. With the acquisition of Highway 371,the <br /> City will obtain more land that is developable. The city may want to consider further <br /> exploring options for future development of these areas. <br /> The City has made significant investments in the infrastructure in this area. The <br /> conversion of the highway into a city street will increase that investment and the City <br /> should look to capitalize on its existing infrastructure investments in the area. <br /> The existing zoning and future land use classifications for this area are Commercial and <br /> Downtown Mixed-Use. <br /> Zoning: Future Land Use: <br /> IL IMM <br /> � u r <br /> ■' I <br /> nr .F <br /> If�* -If <br /> _I- <br /> .f r <br /> ,err i <br /> Pequot Lakes Staff Report 4 <br /> July 18,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.