My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
07-18-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2016 8:49:51 AM
Creation date
4/26/2016 8:49:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Grove Street north to County Highway ill <br /> The area that lies immediately north of the"core downtown"is a transitional area from <br /> �- more intensive uses(core downtown)to less intensive uses(rural property in the <br /> northern part of the city). The city has a small amount of infrastructure in place in this <br /> section of the Highway 371 corridor. The infrastructure that is in place should continue <br /> to be utilized and developed upon,while the areas not served by city infrastructure <br /> should not be intensified until there is demand to extend the utilities. <br /> The existing zoning for this section is Commercial,Transitional Residential and Open <br /> Space. The future land use map identifies this area as Commercial, Urban/Rural <br /> Transition and Shoreline Residential. <br /> 371 , <br /> 377 <br /> 371 <br /> Zoning: Future Land Use <br /> ,Mbnty ,ywy <br /> rf . <br /> t�llllli n <br /> Grove SM IN y <br /> =1-__ <br /> Pequot Lakes Staff Report 5 <br /> July 18,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.