My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
08-15-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 3:41:33 PM
Creation date
4/25/2016 3:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ideal Street Design <br /> Existing Highway 371 (17o ft ROW) West Grove Street(33 ft ROW) <br /> A safe,functional and productive street for the City of Pequot Lakes is not one that has two <br /> high speed travel lanes, a center turn lane and shoulders on both sides. The street design <br /> below has north and south bound travel lanes, parallel parking on both sides, a sidewalk <br /> buffer and a sidewalks on each side of the street. If the existing Highway 371 is to be taken <br /> over by the City, the road will need to be redesigned and reconstructed as a city street. <br /> f <br /> �. CSAH ii/Highway 371 Intersection <br /> Pequot Lakes Staff Report 2 <br /> August 15,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.