My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Gateway Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2013
>
08-15-2013 Planning Commission Meeting
>
3 - Gateway Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 3:41:33 PM
Creation date
4/25/2016 3:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The current intersection is 150 ft. in width. This intersection should be significantly <br /> narrowed to function as a city street. The excess ROW in this area could be platted and <br /> sold for private development. This minimum lot size in the DMU is 2,250 sq.ft.with a 25 <br /> ft. minimum width requirement. <br /> } <br /> 4 t,. <br /> The image below is a concept for the intersection. The drawing has two io ft driving lanes, <br /> 8 ft parallel parking, 8 ft vegetative buffer and an 8 ft sidewalk. The excess ROW could be <br /> platted and privately developed. <br /> R <br /> m; <br /> Apprx 80 h of <br /> � extra ROW <br /> ,tt <br /> n <br /> is fr <br /> 8 ft <br /> t 8 ft <br /> 14 <br /> . PPrx 80 ft of <br /> -, extra ROW <br /> Ps <br /> " <br /> Pequot Lakes Staff Report 3 <br /> August 15,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.