Laserfiche WebLink
recommended light. He requested the Council to obtain quotes for the <br /> electrical system. <br /> Tim Houle stated that the lights as proposed meet the lighting standards for <br /> a residential/commercial area with the 20 foot poles. Council Member <br /> Akerson noted his concern regarding the effect of the lights on the <br /> residential neighbors. Tim Houle noted that this was considered with the <br /> placement of the lights. Mike Loven stated that when considering the height <br /> of the light poles the Council should keep in mind the size of the trucks that <br /> will be using the road. Council Member Gardner noted that a truck height is <br /> 13.6 feet. He noted that he is happy with the 20 foot poles. <br /> COUNCIL MEMBER GARDNER MOVED TO APPROVE THE LAYOUT <br /> FOR THE ELECTRICAL SYSTEM AND TO AUTHORIZE THE ENGINEER <br /> TO OBTAIN QUOTES FOR THE ELECTRICAL SYSTEM ASSOCIATED <br /> WITH THE STREET LIGHTS ON NORTH WASHINGTON AVENUE. <br /> COUNCIL MEMBER SJOBLAD SECONDED THE MOTION. MOTION <br /> CARRIED 5-0. <br /> 9.1. City Engineer Update <br /> Tim Houle presented the following updates. <br /> • VVVVTF Facility Plan <br /> Tim Houle noted that he is working at pulling together the operation costs <br /> and land use issues which will be part of the analysis. <br /> Tim Houle discussed a possible new option on regionalization. The concept <br /> would be to pipe Pequot Lakes' wastewater to the Pine River Area Sanitary <br /> District wastewater treatment plant, about 9 miles away. This has been <br /> discussed with the MPCA. One possible tie in is that it would go past <br /> Jenkins. Through the years, Jenkins has been looking at wastewater <br /> collection, treatment, and disposal options. Initial cost-wise, it would be in <br /> the range of the rapid infiltration basin option. But, the City could sell its <br /> present treatment facility and spray irrigation land and would not have to <br /> worry about odors, spray onto the trail, etc. On the flip side, the City would <br /> give up some "control", would have to pay a monthly treatment cost, and <br /> would have to work through the Sanitary District first well ahead of <br /> expanding and increasing flows. The Council questioned the current <br /> capacity of the Pine River system. Tim Houle noted that it is at 50%. He also <br /> reminded that Council that this option would require the City to look at long <br /> range operational costs. Council Member Sjoblad stated that there is <br /> funding available to encourage the regionalization process. <br /> • The Proposed MnDOT Hwy 371 Project <br /> July 17, 2014 Staff Report page 5 <br />