Laserfiche WebLink
The proposed amended site plan provides for the creation of a second beach area <br /> approximately 150 feet in width on the easterly side of the property inside of docking system number <br /> 2, the location of such docking system having been previously approved. This second beach (in the <br /> location proposed as a part of the original site plan) will require the removal of a minimal amount of <br /> aquatic vegetation as the beach is located on the area where the two mobile home/trailer owners had <br /> previously removed all aquatic vegetation except for a narrow strip between the two pads where the <br /> second docking system is located. The lake bottom in this entire area is hard, sandy soil and will <br /> provide excellent swimming conditions. <br /> The second beach is required to serve the needs of resort guests, who already frequently <br /> complain about the inadequacy of the resort's single beach. A 140 foot beach is simply not adequate <br /> to accommodate 300 to 400 guests who may be on property in season. The addition of the second <br /> beach will result in a total of approximately 350 to 400 feet of the 2653 of the resort's shoreline <br /> (13%) improved with beaches and docking systems, which total footage is far below the requirements <br /> of the Shoreland regulations, which allows up to 663.25 of the Applicant's shoreline to be improved. <br /> (Pequot Lakes Ordinance 17-511, Subd. 4 — Screening Performance Standards for Shoreline <br /> Commercial Property). <br /> Shoreline and Bluff Roadway <br /> The existing CUP provides "that the road in the bluff and shoreline setback shall be removed <br /> and re-vegetated. An 8 foot wide walking trail may replace the road; however, all automobile traffic <br /> shall be banned. The walking trail shall be constructed with pervious materials." <br /> The Applicant is requesting that this section of the CUP relating to the pathway on the <br /> easterly shoreline of the point be amended to: <br /> 6 <br />