My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4A - Amendment to Conditional Use Permit - Wilderness Resort Villas
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2014
>
01-16-2014 Planning Commission Meeting
>
4A - Amendment to Conditional Use Permit - Wilderness Resort Villas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 11:36:38 AM
Creation date
4/22/2016 11:36:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. System Three, also on the easterly side of the property located closest to the existing <br /> villas will contain a total of 18 slips when completed and will extend approximately 125 feet into the <br /> water from the shoreline and will be 220 feet in width. Due to the continued expansion of aquatic <br /> vegetation (principally reeds and bulrushes) since plat approval in 2005, some of the surrounding <br /> aquatic vegetation in the area where the system will be placed (principally on the north side of the <br /> system) may have to be removed, which removal will be subject to obtaining a permit from the DNR <br /> as provided in Section 2 above. <br /> The location of System Two, as well as the locations of Systems One and Three, were <br /> approved by the DNR representative at an on-site inspection and subsequently approved by the <br /> planning commission as part of the CUP/platting process. Wilderness Resort, located on a 32 acre <br /> tract, contains 2653 feet of shoreline or approximately 9% of the total shoreline of Middle Cullen <br /> Lake (29,416 feet). The installation of System Two will require the removal of some bulrushes over <br /> an area of approximately 50 feet wide in and around the docking system. In fact, this area was <br /> selected as the location of the second docking system by the Developer and DNR because it would <br /> "result in the removal or damage to the least amount of aquatic vegetation." <br /> Additional Beach <br /> The present CUP of Wilderness allows for one beach approximately 140 feet wide to serve <br /> the entire resort which has 2653 feet of shoreline representing 9% of the total shoreline of Middle <br /> Cullen Lake (29,416 feet). The new CUP site plan would increase the width of the existing beach by <br /> approximately 35 feet as a result of moving the boat ramp to the north side of the beach to provide a <br /> safer boat launching area where vehicles and trailers will not have to traverse the entire beach access <br /> points to complete launching. Relocation of the ramp will require the removal of approximately 10 <br /> feet of aquatic vegetation on the north side of the beach to allow for installation of the boat launch. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.