Laserfiche WebLink
In talking with the staff and Council liaisons in preparing <br /> our study proposal, and in considering some of the <br /> anticipated challenges with expanding the existing building <br /> on the existing site, the idea was presented to look at a new <br /> site. It is not unusual to have Public Works facilities at a <br /> separate site. Our study will include looking at a new <br /> Public Works building and salt shed at a new site. <br /> As part of the study, we will provide concept drawings as <br /> well as estimated (e.g. square foot basis) construction costs. <br /> Our lump sum fee is $12,800. <br /> Council Action Requested: Council motion approving the <br /> Maintenance Facility Addition and Salt Shed proposal for <br /> design services with Widseth Smith Nolting in the amount <br /> of$1 2,800 to be paid from the Highway 371 Fund. <br />