Laserfiche WebLink
City of <br /> AGENDA ITEM #9.8 <br /> Pequot It <br /> Lakes — <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: November 3, 2015 <br /> Subject: Building Addition and Salt Shed Design Proposal <br /> Report: As requested, we prepared a proposal for a study <br /> of expanding the north end of the existing City Hall to <br /> provide more space for the Maintenance Department. This <br /> study would also include looking at a couple of different <br /> kinds of salt sheds towards the north end of the property — <br /> one would have more of a building look while the other <br /> would be more of a `fabric arch' type structure. <br /> In preparing this proposal, we visited the present City Hall <br /> building and site a couple of times (no charge to the City). <br /> There will be several challenges (code, heating and <br /> ventilation, etc.) in expanding the existing building. This is <br /> why we have included time for necessary architectural, <br /> mechanical, electrical, and structural efforts in our <br /> proposal. <br />