Laserfiche WebLink
City of Pequot Lakes <br /> Turnbacks and Road Extensions <br /> associated with MnDors proposed <br /> 4-lane Trunk Hwy 371 Improvements <br /> Updated December 20.2013 <br /> Segment Segment Name Description Approx. Tumback cost Notes <br /> Number Lenath Yes/No Share <br /> 9 Reconstructed CR 107 connection to Realigned No All State or County City not involved. <br /> new 4-lane TH 371 County Road <br /> North of CR 107-Realigned Paul Realigned City not directly involved. <br /> 10 Bunyan Trail over the new 4-lane TH PBT on a No All State <br /> 371 bridge However can MnDOT work with the DNR on signage on this bridge-especially on the south side <br /> for NB traffic but maybe on both sides-promoting Pequot Lakes?See Segment No.26 too. <br /> As there is already a proposed Rt in-Rt out on the east side,and to minimize truck traffic possibly <br /> having to come through town to access the City's Industrial/Business Park to the west,provide a <br /> New State to take care of it as Rt in-Rt out for SB traffic on the west side instead of a cul-de-sac. <br /> 11 Derksen Road(interrupted by new 4- cul-de-sac No,State part of new 4-lane TH If a cul-de-sac remains on the west side of the new highway construct a hammerhead type <br /> lane TH 371) on West to City 371 project; turnaround instead of a circular cul-de-sac. <br /> City cost=$0 <br /> The City will have increased travel time to and operational costs for City's wastewater treatment <br /> facility(WWTF). <br /> New Casing <br /> Pipes for State to take care of it as <br /> 12 Utility Crossing at Derksen Road Wastewater No,State part of new 4-lane TH Provide two 16-inch steel casing pipes and two 4-inch PVC conduits under the new Hwy 371 for <br /> Treatment to City 371 project; spray irrigation piping,electrical,and control wires. <br /> Facility City cost=$0 <br /> (WWTF) <br /> The City will have increased travel time to and operational costs for City's wastewater treatment <br /> State to take care of it as facility(WWTF). <br /> 13 Derksen Road(interrupted by new 4- Rt in-Rt out No,State part of new 4-lane TH <br /> lane TH 371) on East to City 371 project; To eliminate the Rt in Rt out on the east side(which is good/desirable for the new highway), <br /> City cost=$0 extend the new Segment No.17 roadway further west and south to Derksen Road east of the <br /> City's WWTF stabilization ponds see Segment No.18. <br /> Existing City State to take care of it as The City has a sanitary sewer forcemain in a NW to SE direction north of Derksen Road heading <br /> Sanitary part of new 4-lane TH <br /> 14 North of Derksen Road Sewer NO 371 project; roughly from the south end of Gravdahl Drive to the wastewater stabilization ponds aeration <br /> Foroe Sewer <br /> City cost=$0 blower building.MnDOT will need to put this in a casing pipe under the new highway <br /> State to take care of it as <br /> cul-de-sac <br /> Tree Farm Road(interrupted by new W New No,State part of new 4-lane TH Due to the number of driveways,buses,garbage trucks,and snow plows,construct a 42-feet <br /> 15 4-lane TH 371) on to City 371 project; radius cul-de-sac. <br /> J West ON cost=$0 <br /> Z Drive/Highway 371/Roadway Extensions Page 3 of 13 <br />