Laserfiche WebLink
March 14,2015 Page 2 <br /> Amended Proposal for Design of Row Irrigation <br /> and Permitting Assistance <br /> City of Pequot Lakes <br /> The City intends to fund Items 1 through 6 above with City dollars at a time or times of the City <br /> choosing. We do recommend the City work on these as soon as possible. <br /> While this amended proposal only deals with the design of the proposed row irrigation system <br /> (No. 7 above), we will include Items 1 through 6 in the Amended Facilities Plan so that they <br /> could be eligible for funding assistance should the City want to proceed with them. <br /> As mentioned in the March 3rd proposal,the City has been working with the Minnesota <br /> Department of Transportation (MnDOT) on their 4-lane improvements to Highway 371. These <br /> improvements will impact the City's present wastewater system's pivot spray irrigation effluent <br /> discharge field. <br /> The City has also been working with the Minnesota Pollution Control Agency (MPCA) on these <br /> potential modifications to the City's discharge field. Any significant changes will require <br /> modifications to the City existing discharge permit (called a National Pollution Discharge <br /> Elimination System, or NPDES/State Disposal System, or SDS, Permit). <br /> To provide information to the MPCA as soon as possible so that we can meet MnDOT's <br /> schedule, we will need to proceed in the near future with the design of a new row irrigation <br /> system. <br /> Following are our tasks—as best as we understand them from the various agencies involved: <br /> NPDES/SDS Permit Application <br /> The MPCA is suggesting that since the City's present SDS permit expires in the latter part of <br /> 2016, instead of modifying the City's present permit and then turning around right away and <br /> reapplying for a new permit, the City just start the new permit process with whatever modified or <br /> new discharge system the City wants to pursue. <br /> We will meet with and provide information to the MPCA and assist the City in applying for this <br /> new permit. <br /> Field Survey& Base Map <br /> Office research on horizontal and vertical control, Gopher State One Call, setting control in the <br /> field, boundary survey, topographic survey, and base map preparation. <br /> Research and Preliminary Design <br /> Research and preliminary design for the layout a row irrigation system (4 zones initially <br /> anticipated) including performing preliminary flow and pressure calculations. <br /> J:\01308-City of Pequot Lakes\0130B0054-Wastewater System Improvements\013080054.000-Wastewater System <br /> Improvements\Contracts\WSN\20150314-Row Irrigation Design and Permitting proposal.doc <br />