Laserfiche WebLink
June 28, 2021 <br />Study for Main Street and Front Street <br />City of Pequot Lakes <br />Page 3 <br />WIDSETH <br />We will discuss any possible changes to the street typical sections, including sidewalks, as <br />well as possible streetscape items. <br />3. We would then prepare a colored strip map(s) of possible improvements, showing the <br />following: <br />• Right -of -Way <br />• City sanitary sewer and watermain (maybe — depending on number of lines) <br />• Storm drainage systems (maybe — depending on number of lines) <br />• Street typical sections, including driving lanes, turn lanes, parking lanes, and sidewalks <br />• Possible streetscape components (e.g. benches, decorative street lights, stamped <br />concrete) <br />4. Next, we would hold two Public Open Houses (same content each time —just two nights to <br />maximize people / businesses being able to attend). <br />We would also ask the City to send out emails or mailers to parcels a block or two on either <br />side of these street segments. <br />Through our experience over the years, there is a dichotomy of always seeming like you can <br />never communicate enough tempered by not being able to make people provide you input <br />(or, not being able to sit down with every single person at their kitchen table to talk about the <br />project). We do not want to sound negative on obtaining input from the public, but, quite a bit <br />of effort can be spent and one never knows how much is enough (until, usually, and <br />unfortunately, after -the -fact). <br />5. From these Open Houses, and any input received at City Hall, we would then update the <br />colored strip map(s), provide an estimated construction and project cost (based on per foot <br />costs as well as percentages of construction cost), and an estimated project time line. <br />We would provide this information to the City Council. <br />The City Council can then decide if and how they want to proceed with the project. <br />The City Council may decide not to proceed with any substantial improvements and to just <br />repair pavement (maybe a mill and inlay) and sidewalks as necessary. <br />The City Council may send it back for further Study. <br />The City Council may approve moving it forward into design as presented, or with some <br />adjustments. <br />We can provide these above services for a lump sum amount of $11,600. <br />We anticipate this work would be timed to have the Open Houses in September, with <br />completion shortly thereafter. <br />Once the scope of improvements is determined with this Preliminary Layout Plan effort, we will <br />provide the City with a Final Design and Plan Preparation proposal (this proposal could also <br />include public bidding phase and construction phase assistance). <br />NAMarketing DeptlProposals100 Letter Proposals12021 Letter ProposalslPequot Lakes - Main St and Front St Study - 20210628.docx <br />