My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.4 Main Front Street Study Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
03-06-2023 Council Meeting
>
9.4 Main Front Street Study Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 1:45:13 PM
Creation date
1/3/2024 1:43:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 28, 2021 <br />Study for Main Street and Front Street <br />City of Pequot Lakes <br />Page 2 <br />WIDSETH <br />Storm drainage system = No catch basins (CBs) and pipes until Rasmussen, then CBs and <br />pipes <br />City utilities = None until Rasmussen, then various sanitary sewer and watermain either <br />crossing under running longitudinally <br />Other utilities = Various underground and overhead utilities (telecommunications, natural <br />gas, and power) yet to be determined. <br />Adjacent properties = Multi -family on the south between Gravdahl and Rasmussen, <br />otherwise, mostly businesses. <br />The main exception is Trailside Park. <br />Front Street from Main Street north to Patriot Avenue <br />Road = Two -driving lanes <br />Shoulders or Parking = Two parking lanes <br />Note = The most northern block between West Sibley Street and Patriot Avenue does not <br />have sidewalks. <br />The unusual / challenging layout created by the "triangle" of this most northern block <br />of Front Street, Patriot Avenue, and West Sibley Street has been commented on <br />through the years <br />Curb and gutter or ditch -lined = Curb and gutter <br />Sidewalks / Trail = Sidewalks on both sides (except south side Gravdahl to Rasmussen) <br />Storm drainage system = No catch basins (CBs) and pipes until Rasmussen, then CBs and <br />pipes <br />City utilities = None until Rasmussen, then various sanitary sewer and watermain either <br />crossing under running longitudinally <br />Other utilities = Various underground and overhead utilities (telecommunications, natural <br />gas, and power) yet to be determined. <br />Adjacent properties = Mainly businesses. <br />The main exception is the Cole Memorial Building. <br />We have based our tasks on the effort everyone put forth for recent — we believe, overall, <br />successful - improvements to Rasmussen Road. We all learned a little bit from that process, <br />and so we have tried to incorporate some of those experiences into the following Study tasks for <br />this project: <br />Prepare a base map from publicly available sources that will show: <br />• Right -of -Way <br />• City sanitary sewer and watermain <br />• Storm drainage systems <br />• Telecommunications, natural gas, and power utilities (obtained from a Gopher State One <br />Call — map option) <br />• Street typical sections, including sidewalks <br />2. We will take this base map and meet once with a City Committee. <br />We suggest two Council Members, the City Administrator, the City Public Works Director, <br />the City Zoning Administrator, the City Zoning Specialist, and the City Water/Wastewater <br />Operator. <br />NAMarketing Dept\Proposals100 Letter Proposals12021 Letter ProposalslPequot Lakes - Main St and Front St Study - 20210628.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.