My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Water/Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
04-01-2008 Council Meeting
>
08 - Water/Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2014 2:46:17 PM
Creation date
9/19/2014 2:46:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Met with owners of the Wooddale apartments,which currently are non-metered <br /> accounts. Two 1"water meters will be installed(one for each building),to accurately <br /> meter these apartment buildings. <br /> • Was called to the south end of the Oasis, since no water was available at this location. It <br /> was determined that their service line had froze, since our water main was fine. <br /> • Rick Buer from AE2S was here to assure that flow meter totalizers at the plant are <br /> working properly and that the daily reporting values are accurate. After several days <br /> pass,he will need to come back to ensure all is working properly since daily recording <br /> values have now been changed. <br /> • Utilized water meter test bench to establish a procedure in determining the accuracy of <br /> water meters. <br /> • Received a call from the Pequot Pines apartment on the 25th stating that the maintenance <br /> manager had cut into a water line to replace a section of piping,but was unable to <br /> isolate the water line which caused some minor flooding in their utility room. At this <br /> point,the main water valve was then shutdown to the whole building until the repairs <br /> could be made. As the water was slowly restored, assisted the manager in making sure <br /> no problems occurred. <br /> WASTEWATER <br /> Facility Performance: <br /> a. CBOD Concentration <br /> Influent— 199 mg/1 (Design—250 mg/I) <br /> Effluent—mg/1 <br /> b. TSS Concentration <br /> Influent— 162 mg/1 (No Design Listed) <br /> Effluent—mg/1 <br /> c. Effluent Fecal Coliform Geometric Mean— organisms/100 ml <br /> Permit Condition—200 organims/100 ml <br /> d. Flow- Average Daily Flow—63,756 gallons (Design— 121,795 gal/day) <br /> Maximum Daily Flow—81,976 gallons <br /> Minimum Daily Flow—48,576 gallons <br /> Total Monthly Flow- 1,593,904 gallons(as of the 25`h) <br />
The URL can be used to link to this page
Your browser does not support the video tag.