II. Operations and Maintenance: <br /> • The monthly MPCA Discharge Monitoring Report was completed and submitted as <br /> required. <br /> • Attended Mn. Rural Water conference in St. Cloud from March 4th-6th. <br /> • Will be receiving an excellence award from the M.P.C.A. for the continued operation <br /> efforts in protecting the waters of the state. <br /> • Sampled and sent in quarterly influent sample. <br /> • Several air leaks have been observed at the facility and will need to be repaired. This <br /> will require the lowering of the primary pond and removal of the rocks and soil, to <br /> determine any solutions of how these can be fixed. <br /> • On the 12th, utilized crane to pull each pump at the main lift station and remove debris <br /> from these pumps before it became a problem. <br /> • Have been working with Mike Rude from WSN on mapping updating. After receiving <br /> these, inspected each water main valve and noted any changes on the map. This will <br /> also be done to correct any changes on the sewer mapping. <br /> • On the 24th, Tina and myself began inspecting manholes. At the intersection of Spruce <br /> & West Grove St. the manhole was found half full of water. Followed sewer along <br /> Spruce St. to West Sibley and determined there was a blockage along these two blocks. <br /> After attempting to jet to the north and not having any results,we then jetted to the <br /> south from the midway point and cleared whatever had caused the blockage. These two <br /> blocks may need to be televised in order to evaluate what may be the problem. <br /> • On the 25th, pumped out remaining water at an access manhole where the air-lines that <br /> feed air to the ponds had been leaking. <br /> • Completed 12 work orders. <br /> Report Submitted By: Gary Giltner <br /> Water/Wastewater Supervisor <br /> City of Peouot Lakes <br />