Laserfiche WebLink
Lots 5-10 <br /> • Each lot is 26'x 72' <br /> • In the same general location as existing Lots 55-60 <br /> Lot u <br /> • Contains the lodge previously approved via CUP <br /> • <br /> Will be subdivided by condominium plat once constructed <br /> Lots 12-24 <br /> • No changes <br /> Lots 25&26 <br /> • Each lot is 28'x 67.67 <br /> • Slightly rotating clockwise <br /> • In the same general location <br /> Lots 27-34 <br /> • No changes <br /> Lots 35&36 <br /> • Each lot is 26'x 67.67 <br /> • Shifting approximately io ft southeast <br /> Lots 37-40 <br /> • Each lot is 40'x 76' <br /> • In the same general location of existing Lots 37-40 <br /> Lots 41-44 <br /> • Each lot is 28'x 62' <br /> • Shifting approximately 25 ft north of existing Lots 43-46 <br /> Lot 45 <br /> • Located within tier 3 <br /> • Approximately 52'x 55' <br /> • On-site manager housing <br /> Lots 61-63 <br /> • Currently Amenities building and lots for future meeting room and maintenance <br /> building. <br /> A total of 18 lots are being removed from the plat (5-11, 41-42, 47-54, and 59-6o) and <br /> two are being added("new'11 and 45). <br /> The previously approved stormwater management plans have been updated to include <br /> facilities to manage stormwater runoff generated by the lodge building and additional <br /> parking area approved as part of the conditional use permit. There are various basins, <br /> swales and retaining walls used to manage stormwater onsite. The proposed <br /> stormwater management plan appears to contain the ioo-year storm even as required by <br /> the ordinance. <br /> Pequot takes Council Report 2 <br /> June 3,2014 <br />