My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.2 Joint Road Project Request for Proposal (RFP)
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
11-10-2020 City Council Meeting
>
09.2 Joint Road Project Request for Proposal (RFP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:10:59 PM
Creation date
3/8/2021 3:39:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 5 of 19 <br /> <br />Wing County Coordinate datum NAD83 (1996 Adj) for horizontal control and NAVD 88 for <br />vertical control. <br /> <br />The horizontal accuracy standard for these positions shall be similar to those defined in the <br />2005 version of the accuracy standards for ALTA/ACSM land title surveys 9appendix 1. <br />County standards will require 0.05 feet for positional accuracy for all boundary corner <br />location and Public Land Survey Corner used in this project. <br /> <br />The role of the selected Consultant team will be to complete all tasks necessary to guide this <br />project through advanced project coordination, preliminary planning/design, and alternative <br />development. The consultant will be evaluated on their use of technology and innovative <br />strategies to produce project deliverables. The consultant shall also strive to gain Public and <br />Agency support for the project while completing a variety of deliverables. Agency input shall <br />be incorporated on a regular basis to minimize potential conflicts and delays. <br /> <br />The project deliverables have been segmented into 3 phases. The City/Township Coalition <br />will decide when to authorize each phase based on project need. For this RFP, Phase 1 will <br />be authorized immediately following the selection process of the qualified consultant. Phase <br />2 and 3 will be authorized at a future date, if deemed relevant or necessary. The consultant <br />shall provide a detailed itemized cost breakdown for each phase of the deliverables; however, <br />only the first phase of work will be guaranteed at this time. It is the Coalition’s intention to <br />award all Phases to one consultant, should Phase 2 and 3 become necessary. <br /> <br />2.1. Phase 1 Deliverables – Project Planning and Development <br /> <br />2.1.1. Project Management <br /> The Project Manager will perform all work necessary to effectively coordinate the <br />project development, maintain the project schedule, and adhere to the project budget <br />starting with a project kick off meeting and ending with quality deliverables. The <br />proposal should include a summary of the project management measures required to <br />ensure that the project is completed on time, within budget and in accordance with <br />applicable laws, policies, standards and good engineering practice. The selected <br />consultant shall develop and implement a project specific Quality Management <br />Plan, which shall be available for review upon request during the project. The <br />Project Manager, along with associate experience, shall be included in the proposal. <br /> <br />2.1.2. Public and Agency Involvement <br /> A goal of the Cooperative Community Enhancement Project is to achieve <br />excellence in customer service through a comprehensive public engagement <br />process. A robust and focused public engagement plan will be essential to facilitate <br />community acceptance of this project, while maintaining our transportation <br />objectives and requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.