My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.2 Joint Road Project Request for Proposal (RFP)
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
11-10-2020 City Council Meeting
>
09.2 Joint Road Project Request for Proposal (RFP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:10:59 PM
Creation date
3/8/2021 3:39:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 19 <br /> <br />the appropriate final jurisdiction. The Consultant shall involve the County <br />Engineer while planning for final jurisdictional determination. <br />x Funding – This project is not fully budgeted at this time. The Consultant shall <br />identify potential funding sources to aid construction (i.e Gravel tax, state <br />bonding. Etc.). Funding type availability may alter the Coalition’s goals and <br />objectives. <br />x Design Standards – The road design standard is flexible based on the Coalitions <br />need and the type of funding source available. It is important for the Consultant <br />to understand the long-term goals of each Agency before selecting a standard. <br />The Consultant will need to provide cost estimates and preliminary designs for <br />multiple standards. <br />x Traffic Patterns – This project has the likelihood to change traffic patterns in the <br />area. The Consultant will need to account for future traffic patterns during the <br />planning stages of this project. <br /> <br /> <br />1.5. Previous Project Documentation <br />In 2013, the City of Pequot Lakes and Ideal Township explored an option to improve <br />Nelson Road in an effort to reduce maintenance costs associated with the roadway. The <br />engineering firm Widseth Smith and Nolting began designing a preliminary plan for <br />construction in 2014. Due to a change in local agency priorities, this project was halted <br />at 90% design stage and has not advanced to date. This plan did not include roadway <br />design consistent with State Aid standards. <br /> <br />In 2012, the Crow Wing County Highway Department initiated a transportation study on <br />the CSAH 11 corridor between the City of Pequot Lakes and the City of Breezy Point. <br />Engineering firm Bolton & Menk, Inc. developed a comprehensive report to help the <br />County and surrounding cities plan for future development along the CSAH 11 corridor. <br />Part of this document included a future look at improving the Ackerson/Buschmann <br />route to address some of the existing and future traffic in the area. This study can be <br />found on the Crow Wing County website at http://www.crowwing.us/1565/Road-Studies. <br /> <br />All previous project documentation or studies will be made available and should be used <br />to the extent that the information is still accurate and relevant. <br /> <br /> <br />2. SCOPE OF SERVICES AND DELIVERABLES <br /> <br />All aspects of the scope of services outlined below are expected to be completed within the <br />project deadlines. All reports/documentation shall be submitted to the City/Township <br />Coalition and must be presented in paper and electronic form. Likewise, all project design <br />files shall be developed using ACAD Civil 3D version 2013 or later. In reference to all <br />survey and design files associated with this project, the selected consultant must use Crow
The URL can be used to link to this page
Your browser does not support the video tag.