Laserfiche WebLink
Page 4 of 19 <br /> <br />the appropriate final jurisdiction. The Consultant shall involve the County <br />Engineer while planning for final jurisdictional determination. <br />x Funding – This project is not fully budgeted at this time. The Consultant shall <br />identify potential funding sources to aid construction (i.e Gravel tax, state <br />bonding. Etc.). Funding type availability may alter the Coalition’s goals and <br />objectives. <br />x Design Standards – The road design standard is flexible based on the Coalitions <br />need and the type of funding source available. It is important for the Consultant <br />to understand the long-term goals of each Agency before selecting a standard. <br />The Consultant will need to provide cost estimates and preliminary designs for <br />multiple standards. <br />x Traffic Patterns – This project has the likelihood to change traffic patterns in the <br />area. The Consultant will need to account for future traffic patterns during the <br />planning stages of this project. <br /> <br /> <br />1.5. Previous Project Documentation <br />In 2013, the City of Pequot Lakes and Ideal Township explored an option to improve <br />Nelson Road in an effort to reduce maintenance costs associated with the roadway. The <br />engineering firm Widseth Smith and Nolting began designing a preliminary plan for <br />construction in 2014. Due to a change in local agency priorities, this project was halted <br />at 90% design stage and has not advanced to date. This plan did not include roadway <br />design consistent with State Aid standards. <br /> <br />In 2012, the Crow Wing County Highway Department initiated a transportation study on <br />the CSAH 11 corridor between the City of Pequot Lakes and the City of Breezy Point. <br />Engineering firm Bolton & Menk, Inc. developed a comprehensive report to help the <br />County and surrounding cities plan for future development along the CSAH 11 corridor. <br />Part of this document included a future look at improving the Ackerson/Buschmann <br />route to address some of the existing and future traffic in the area. This study can be <br />found on the Crow Wing County website at http://www.crowwing.us/1565/Road-Studies. <br /> <br />All previous project documentation or studies will be made available and should be used <br />to the extent that the information is still accurate and relevant. <br /> <br /> <br />2. SCOPE OF SERVICES AND DELIVERABLES <br /> <br />All aspects of the scope of services outlined below are expected to be completed within the <br />project deadlines. All reports/documentation shall be submitted to the City/Township <br />Coalition and must be presented in paper and electronic form. Likewise, all project design <br />files shall be developed using ACAD Civil 3D version 2013 or later. In reference to all <br />survey and design files associated with this project, the selected consultant must use Crow