My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01A Rasmussen Road & South Washington Avenue Improvement Project - Certificate of Substantial Completion
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
08-04-2020 City Council Meeting
>
09.01A Rasmussen Road & South Washington Avenue Improvement Project - Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 10:35:34 AM
Creation date
7/31/2020 10:35:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W i DSETH <br /> July 13, 2020 <br /> Brainerd/Baxter <br /> 7804 Industrial Park Road <br /> PO Box 2720 <br /> Jeff Wipper aaxte� ��N 56425-2�20 <br /> RL Larson Excavating, Inc. ?18.829.511% <br /> 2255 12�" St. SE Baxter@Widseth.com <br /> St. Cloud, MN 56304 Widseth.com <br /> Re: Rasmussen Rd. and South Washington Ave. Road and Utilities Improvements — Punchlist <br /> Widseth Project No. 2019-10204 <br /> Dear Mr. Wipper, <br /> The first walk through for the above-mentioned project was completed Thursday, July 9th, 2020 with <br /> representatives from the City of Pequot Lakes, RL Larson, and Widseth present. The following punch <br /> list items were noted during the review. <br /> 1. Install 31089 Rasmussen Rd. E911 sign <br /> 2. Switch mailboxes — 30602 & 30613 <br /> 3. Final Newsletter <br /> 4. Landscaping Lindquist property — NE corner of Main St. and Rasmussen Rd. Remove topsoil and <br /> restore with landscape fabric, rock mulch, and shrubs. Details to follow. <br /> 5. Final tracer wire test—observed by Widseth and/or City staff <br /> 6. Lay down area in the Industrial Park needs to be restored with topsoil and seed (25-141) <br /> 7. Remove temporary mailboxes <br /> 8. Final sweeping <br /> 9. Entire project— scrape off bituminous chunks. If bituminous/tack cannot be removed from <br /> concrete, remove and replace concrete panel(s). <br /> 10. Bituminous trail patch at North Rae Ave — Sawcut and remove patch. Replace up to pedestrian <br /> ramp. <br /> 11. North Rae Ave washout area— restore with topsoil, seed, erosion control mat, and bio-roll. <br /> 12. Stormwater basin washout area — restore with class 5, topsoil, seed, erosion control mat, rip-rap, <br /> erosion control blanket, and bio-roll. Install bio-roll along top forebay. <br /> 13. Entire project— restore area where silt fence was removed. <br /> 14. 30817 Rasmussen Rd washout— restore with topsoil and seed <br /> 15. Install mailbox for 30902 Rasmussen Rd. <br /> 16. Entire project— restore sink holes around light pole basis and handholes with topsoil and seed <br /> ARCHITECTS ■ ENGINEERS ■ SCIENTISTS ■ SURVEYORS <br /> 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.