My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01A Rasmussen Road & South Washington Avenue Improvement Project - Certificate of Substantial Completion
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
08-04-2020 City Council Meeting
>
09.01A Rasmussen Road & South Washington Avenue Improvement Project - Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 10:35:34 AM
Creation date
7/31/2020 10:35:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1JVi D��ETH <br /> 17. Entire project— remove utility conduits that are exposed above surface <br /> 18. Reinstall "Enter" and "ExiY' signs at the church parking entrances <br /> 19. Replace wood steps at 30973 Rasmussen Rd. <br /> 20. Electrical pull box needs to be adjusted to be set flush with the concrete at the SE corner of Main <br /> St. and Rasmussen Rd. <br /> 21. Tripping hazard at Leslie's Boutique needs to be addressed where the wood ramp and concrete <br /> landing meet. <br /> 22. Entire project— remove skid-steer/loader tire marks. Ex. In front of Asian Accents and the Library <br /> 23. The tree around the street light between The Wild Daisy and the Library needs to be trimmed. <br /> 24. 31158 Rasmussen Rd. —shape topsoil from driveway to catch basin, restore seed. <br /> 25. Adjust gate valve at East Sibley and Rasmussen Road <br /> 26. "Bird bath" in parking area in front of Timeless Appeal needs to be addressed. <br /> 27. Adjust storm sewer cleanouts and install irrigation boxes at Leslies Boutique. <br /> 28. Adjust gate valve and at Main St. and Washington Ave. <br /> 29. Repaint yellow sidewalk marking at Edward Jones building. Add red stripe below yellow marking. <br /> 30. Remove wood lath from pavement at Edward Jones parking area, repair bituminous. <br /> 31. Reshape topsoil along southside of Butler St., restore with seed. <br /> 32. Handrail and post delineators for the ada ramp on the SE corner of Main St. and Washington Ave. <br /> 33. Entire project—obtain full and vigorous growth of turF/grass, maintain per the specifications. <br /> Please keep us informed about the status of the punch list items. After the punchlist items are <br /> addressed a final walk through will be scheduled. <br /> If you have any questions or need clarification on the above items, please contact me. <br /> Sincerely, <br /> WIDSETH <br /> ��. <br /> Tony Pohl, P.E. <br /> Cc: Jason Gorr, City of Pequot Lakes <br /> Andy Schwartz—City Contracted Operator <br /> Steve Rugroden—Widseth Construction Observer <br /> Tim Houle—Widseth Assistant Engineer <br /> ARCHITECTS ■ ENGINEERS ■ SCIENTISTS ■ SURVEYORS <br /> 2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.