My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01A Rasmussen Road & South Washington Avenue Improvement Project - Certificate of Substantial Completion
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
08-04-2020 City Council Meeting
>
09.01A Rasmussen Road & South Washington Avenue Improvement Project - Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 10:35:34 AM
Creation date
7/31/2020 10:35:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCllC= <br /> EIIGINEkHS 101N1 CON1F4Gi <br /> DOCUMENTS COMMITTEE <br /> CERTIFICATE OF SUBSTANTIAL COMPLETION <br /> Owner: City of Pequot Lakes Owner's Contract No.: N/A <br /> Contractor: RL Larson Excavating, Inc. Contractor's Project No.: N/A <br /> Engineer: Widseth Engineer's Project No.: 2019-10204 <br /> Project: Rasmussen Road & South Washington Ave Contract Name: N/A <br /> This final Certificate of Substantial Completion applies to: <br /> � All Work ❑ The following specified portions of the Work: <br /> �U�Y Znd, 2�2� <br /> Date of Substantiai Completion <br /> The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and <br /> Engineer, and found to be substantially complete. The Date of Substantial Completion of the Work or portion thereof <br /> designated above is hereby established, subject to the provisions of the Contract pertaining to Substantial Completion. <br /> The date of Substantial Completion in the final Certificate of Substantial Completion marks the commencement of the <br /> contractual correction period and applicable warranties required by the Contract. <br /> A punch list of items to be completed or corrected is attached to this Certificate. This list may not be all-inclusive, and <br /> the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in <br /> accordance with the Contract. <br /> The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, <br /> insurance, and warranties upon Owner's use or occupancy of the Work shall be as provided in the Contract, except as <br /> amended as follows: (Note:Amendments of contractual responsibilities recorded in this Certificate should be the product <br /> of mutual agreement of Owner and Contractor;see Paragraph 15.03.D of the General Conditions.J <br /> Amendments to Owner's <br /> responsibilities: � None <br /> ❑As follows <br /> Amendments to <br /> Contractor's responsibilities: � None <br /> ❑As follows: <br /> The following documents are attached to and made a part of this Certificate: Punchlist <br /> This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents, nor is it a <br /> release of Contractor's obligation to complete the Work in accordance with the Contract. <br /> EXECUTED BY ENGINEER: RECEIVED: RECEIVED: <br /> By: �J "_'a— ����-'"� By: By: <br /> (Authorized si�nature) Owner(Authorized Signature) C'ontractor(Authorized Signature) <br /> T�t�e: Project Engineer Title: Title: <br /> Date: 07/13/2020 Date: Date: <br /> E1CDC°C-625,Certificate of Substantial Completion. <br /> Prepared and published 2013 by the Engineers Joint Contrect Documents Committee. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.