My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01 City Council Meeting Minutes
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
07-07-2020 City Council Meeting
>
06.01 City Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 11:52:00 AM
Creation date
7/1/2020 11:51:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br /> June 2, 2020 <br /> Page 4 of 12 <br /> ----------------------------- <br /> The May 2020 Public Works Report was received by Council. <br /> 9.1. Rasmussen Road & South WashinQton Avenue Improvement Proiect <br /> 9.1.A. Update <br /> Tim Houle gave the Council a verbal update on the Rasmussen Road Project. He <br /> stated that since the May 5th City Council Meeting RL Larson has done a lot of <br /> good work fast. He said they had to have another construction observer to keep <br /> up with them at times. He said they are done with the underground sanitary <br /> sewer water main and storm sewer work. He said they are also basically done <br /> with the new curb and gutter. Mr. Houle said they have put the first lift of <br /> bituminous pavement south of Main Street and they hopefully by the end of this <br /> week they will have the first lift of two lifts of bituminous pavement on the north <br /> side of Main Street. He stated they are shooting to have all the sidewalks, <br /> boulevards, paving the driveway aprons done by the end of next week. He said if <br /> they have not finished with the first lift of the bituminous payment they will finish <br /> that up next week and then they can start to top soil and seed behind the curves <br /> and the sidewalks. <br /> Mr. Houle said that this morning at the weekly construction progress meeting, RL <br /> Larson said that they believe they are a bit ahead of schedule. He said they hope <br /> to have the final bituminous down by the end of June which on their first schedule <br /> would not happen until after July 4th. Mr. Houle said they are keeping Main <br /> Street open and they have business open signs on the east and west sides of the <br /> Street. <br /> Mr. Houle said there have been some challenges and they want to thank Jason <br /> Gorr, the residents, and the businesses. He said they know that the construction <br /> activity involves interruptions, disturbances, and change. <br /> 9.1.B. Chanqe Orders <br /> Tim Houle stated that this is the fourth change order on the project. He stated <br /> that a decision is needed on whether to use pavers or colored concrete in the <br /> space between the curb/gutter and the sidewalk on several of the blocks of the <br /> project. He said this space is often called the boulevard. He said the contractor <br /> provided pricing for both colored concrete and for stamped colored concrete. Mr. <br /> Houle stated the stamped colored concrete was definitely more expensive than <br /> the unit price for the pavers but the colored concrete unit price was a little bit <br /> more than the pavers at 40 cents per square foot. <br /> Tim Houle explained they adjusted the width of the boulevard as it was slated to <br /> be six feet but with some utility challenges they decreased it to five feet. He <br /> explained that even though the change order presented to the Council will cost <br /> an additional $2,000 when you look at the decrease in the quantity it may actually <br />
The URL can be used to link to this page
Your browser does not support the video tag.