My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Maintenance Facility Project - Potential Closeout of Contract
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
06-02-2020 City Council Meeting
>
09.02 Maintenance Facility Project - Potential Closeout of Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 1:14:19 PM
Creation date
5/28/2020 1:14:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> Document G701� - 2017 <br /> Change Order <br /> PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER II�ORMATION: <br /> WSN No.0130B0063.000 Pequot Lakes Conhact For:General Construction Chenge Order Number: 1 <br /> Msintenance Dept.Gatage <br /> Pequot Lakes,IvIIV Date:February 22,2018 Date:October 18,2018 <br /> OWNER:(Name and address) ARCHITECT:(Name and address) CONTRAC70R:(Name and address) <br /> City of Pequot Lakes Widseth Smit6 Nolting&Assoc.,Inc. Boser Conahuction,Inc. <br /> 4638 Msitl Street 7804 Industrisl Pazk Rosd 7135 Sth Avenue NE <br /> Pequot Lakes,MN 56472 PO Box 2720 Sauk Rapids,MN 56379 <br /> Baxtex,MN 56425 <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Insert a detailed description of the change and,if applicable,attach or reference specific exhibits.Also inctude agreed upon adjustments <br /> attributable to executed Construction Change Directives.) <br /> Liquidated Damages 5500 x 13 days= Deduct 56,500.00 <br /> The original Contract Sum was S 894,000.00 <br /> The net change by previously suthorized Change Orders ; �•� <br /> The Contract Sum prior to this Change Order was s 894 D00.00 <br /> The Conhact Sum will be decreased by this Change Order in the amount of s 6,500.00 <br /> The new Con�act Sum including this Change Order will be S 887,500.00 <br /> The Contract Time will be unchaaged by Zero(0)days. <br /> The new date of 5ubstantial Completion will be uncbanged. <br /> NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maxunum Price,or the Contract <br /> Time,that have been authorized by Construction Change Direcrive until the cost and time have been agreed upon by both the <br /> Owner and Contractor,in which case a Change Order is executed to supersede the Construc6on Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. <br /> 'dseth Smith Nolti & ssoc.,Jna Boser Construction,Ina City of Pequot Lakes <br /> ARC CT(Fir CONTRACTOR(Firm name) OWNER(Firm name) <br /> 81GNA UR SIGNATURE SIGNATURE <br /> Douglas A Archer <br /> PRINTED NAME AND TITLE PRINTED NAME AND TiTLE PRINTED NAME AND TITLE <br /> ►o%ts/n.ota <br /> DA DATE DATE <br /> AIA Docum�nt G701�—2017.CopyrigM m 1979,1987,2000,2001 end 2017 by The Amer�an InstlWte of Architecta.Ail riphts rourved.WARNING:This <br /> AIAm DoeumaM is probcted by U.S,CopyrlpM Lew end Irhem�lonal Tn�tfea.Unauthorizod nproduction or dlatribution of ffiia AIA�Docum�nt,or .) <br /> any portlon of It,may rosult in savan civll and criminal penaltiss,and wlll bo pro�ecubd to tf»maximum extsnt posslble undsr the law.This <br /> document was produced by AIA soRware et 15:13:�on 1 0/1 812 0 1 6 under Order No.3099316714 which expi►ee on 01/10/2019,and ia not fa resele. <br /> U�er Nobs: (369ADA27) <br />
The URL can be used to link to this page
Your browser does not support the video tag.