My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Maintenance Facility Project - Potential Closeout of Contract
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
06-02-2020 City Council Meeting
>
09.02 Maintenance Facility Project - Potential Closeout of Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 1:14:19 PM
Creation date
5/28/2020 1:14:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l� : et� n.s,rB <br /> Boser Construction,Inc. ��dM't' , <br /> CQNTRACTOR(Firm SIGNA RE PRINTED NAItlIE AND TITLE DATE <br /> Name) <br /> City of Pequot Lakes <br /> OWNER(Firm Name) SIGNATURE PRINTED NAME AND TITLE DATE <br /> AIA DocumeM G7M"'-2017.Copyright� 1963,1978,1992,2000 and 2017 by The Am�icen Institute of Architects.All riyhb reserwd.WARNING:This <br /> AIAe Oocument fs protected by U.S.Copynght Law and IMemational Treatles.Unauthorized reproductlon or distri6utlon of this AWo Document,or Z <br /> any portbn oi It,may resuR In severe elvil and criminal penalties,and wlll ba prosecuted to the maximum eztent possibla under the law.This <br /> d�ument was produced by AIA soflware at 71:33:47 on 1 0/1 91201 8 under Order No.3099318714 which expires on 01l10/2079,and is not for resele. <br /> Usar Notes: (389ADA31) <br />
The URL can be used to link to this page
Your browser does not support the video tag.