� <br /> Document G704� - 2017 <br /> Certi�cate of Substantial Completion <br /> PRWECT:(name and address) CONTRACT INFORIVIATION: CERTIFICATE INFORMATION: <br /> Project No.0130B0063.000 Contract For:General Construction Certificate Number: 1 <br /> Pequot Lakes Maintenance Dept.Garage <br /> Pequot Lakes,MN Date:February 22,201 S Date:October 12,2018 <br /> OWNER:(name and addr�ss) ARCHITECT:(name and address) CONTRACTOR:(name and address) <br /> City of Pequot Lakes Widseth Smith Nolting&Assoc.,Inc. Boser Construction,Inc. <br /> 4638 Main Street 7804 Industrial Park Road 7135 Sth Avenue NE <br /> Pequot Lakes,MN 56472 PO Box 2720 Sauk Rapids,MN 56379 <br /> Ba�cter,MN 56425 <br /> The Work identificd below has been reviewcd and found,to the Architect's best knowlcdgc,information,and belicf,to bc substantially <br /> complete. SubstanHal Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in <br /> accordance with the Conhact Documents so that the Owner can occupy or utilize the Work for its intended usc.Thc date of Substantial <br /> Completion of the Project or portion designated below is the date established by this Certificate. <br /> (Identify the Work,or portion thereof,that rs substantiallv complete.) <br /> As specified <br /> Widseth Smith Noltin <br /> &Assoc.,Inc. Douglas A.Archer October 12,2018 <br /> ARCHITECT(Firm Nanee) SIC�1 RE PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION <br /> WARRANTIES <br /> The date of Substantial Completion of the Project or portion designated above is also the date of commencement of app(icable warranties <br /> required by the Contract Documents,except as stated below: <br /> (/dentify warranties that do not commence on fhe date of Substantial Conepledon,if any,and rndicate their date of commencement.) <br /> WORK TO BE COMPLETED OR CORRECTED <br /> A list of items to be completed or coaected is attached hereto,or transmitted as agreed upon by the parties,and identified as follows: <br /> (Identifp the li.cf of Work to be completed or co�•rected.) <br /> 10-4-18 Punch List <br /> 10-15-18 Punch List <br /> Exception is seeding and turf development which is to be completed as weather permits in the spring of 2019. <br /> The failure to include any items on such list does not alter the responsibility of the Contractor to coinplete all Work in accordance with the <br /> Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attachad tist will be <br /> the date of issuance of the final Certificate of Payment or the date of final payment,whichever occurs fust.The Contractor will complete or <br /> correct the Work on the list of items attached hereto within thirty(30)days from the above date of Substantial Completion. <br /> Cost estimate of Work to be completed or corrected: $17,000.00 <br /> The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work,insurance,and other items <br /> identified below shall be as follows: <br /> (Note:Owner's and Contraclor's Iegal anr!insurance counse!should review insurance requirements and coverage.J <br /> As specified. <br /> The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion: <br /> AIA Dacument G704"'—201T.Copyright� 1963,1978,1992,2000 and 2017 by The American Instihite of Architects.All riyhts ressrved.WARNING:thls <br /> AIAm Document is proteeted by U.S.Copyright Law and Internallonal TreaUes.Unauthorfzed reproduction or distNbution of thls AIA�'Document,or � <br /> a�y portton of it,may result in severe clvll and crlminal penaltles,and wNl be prosecuted to the maxlmum extant posslbla under the law.This <br /> document was produced by AIA soflware at 1133:47 on 10/19l201B under Order No.3�99318714 which exqres on 01/1012019,and Is not�or resale. <br /> U�er Notss: (389ADA31) <br />