Laserfiche WebLink
City of Pequot Lakes <br /> Infrastructure Planning Workshop <br /> DRAFT * Tuesday, January 20, 2009, 6:30 p.m. * DRAFT <br /> III. ROADWAY SYSTEM <br /> A. Review of Existing System <br /> Street Standards <br /> Typical Sections <br /> Urban—curb and gutter—storm sewer- sidewalks <br /> Rural—swales and ditches <br /> Room for other utilities (gas, electric,telephone, cable) <br /> Pavement thickness dependent on soils and traffic <br /> B. Future Enhancements/Extensions? <br /> With four-lane improvements to T.H. 371 upcoming, looking ahead will continue <br /> to be important. <br /> When doing underground work,there is an opportunity to improve the road. Or, <br /> prior to doing road work, look at underground improvements. <br /> C. Unless working with the County or MnDOT, while we think it is prudent to do so, <br /> there is no regulatory requirement for roadway construction drawings and <br /> specifications to be signed by a licensed professional engineer. <br /> D. Assessment Policy(new and pro-rated on age of replacements). <br /> E. Is General Fund allocation sufficient for upcoming needs? <br /> Page 4 of 7 <br /> CADocuments and Settings\Sandy\Local Settings\Temporary Internet Files\OLK23\20090120-Infrastructure Workshop With City Council.doc <br />