Laserfiche WebLink
City of Pequot Lakes <br /> Infrastructure Planning Workshop <br /> `-' DRAFT * Tuesday, January 20, 2009, 6:30 p.m. * DRAFT <br /> IV. STORM DRAINAGE SYSTEM <br /> A. Review of Existing System (Age and condition of different sections) <br /> B. Future Improvements? <br /> P&Z opportunity to not allow impervious coverage areas to be exceeded. <br /> The Council can continue to review each request as it comes up. <br /> Or,the Council may want to consider working with staff and us on putting <br /> together some guidelines,rating system, and/or a Masterplan for possible future <br /> storm drainage improvements. <br /> C. Standards (in conjunction with roadway standards) <br /> • Try to deal with it as close to source as possible. <br /> • 100-year storm? <br /> • Swales with `rainwater gardens'. <br /> D. Unless working with the County or MnDOT, while we think it is prudent to do so, <br /> there is no regulatory requirement for storm drainage construction drawings and <br /> specifications to be signed by a licensed professional engineer. <br /> E. Is portion of future levy appropriate for level of improvements? <br /> + Yearly check of needs and estimated costs. <br /> Page 5 of 7 <br /> CADocuments and Settings\Sandy\Local Settingffemporary Internet Files\OLK23\20090120-Infrastructure Workshop With City Council.doc <br />