Laserfiche WebLink
February 27, 2019 WIDSETH <br /> Proposal for Rasmussen Road Design SMITH <br /> City of Pequot Lakes <br /> Page 3 , NOLTING <br /> We can assist the City in preparing a Request For Proposal from soil boring-geotechnical <br /> engineering firms, review the proposals, and assist the City in contracting directly with such <br /> a firm. <br /> 6. Layout sanitary sewer removal and replacement. <br /> 7. Layout watermain removal and replacement. <br /> 8. After improvements are laid out far enough along to identify possible impacts on electric, <br /> natural gas, and telecommunications utilities, meet with these utilities to review the project <br /> and their anticipated relocations. <br /> 9. Calculate the volume from the City street improvements and any tributary surfaces that may <br /> reach Rasmussen Road for both a 5-year and 10-year recurrence interval. <br /> 10. Lay out a preliminary infiltration basin on the City property to the east of the water treatment <br /> plant. Determine what volume can be captured at this location and what grading will be <br /> needed. <br /> 11. Design a new storm sewer system of catch basins, piping, and storm sewer manholes to <br /> provide for positive drainage. <br /> 12. Layout diagonal and parallel parking areas, along with driveway aprons. Review this layout <br /> with the City. <br /> If the City needs our assistance in working with adjacent property owners on parking in front <br /> of their property and on driveway aprons for their property, we will identify the effort <br /> necessary at that time and provide those additional services as needed. <br /> 13. Prepare preliminary plan view drawings of the Main Street& Rasmussen Road intersection, <br /> curb and gutter, any `bump outs' at intersections, driveway aprons, parallel and diagonal <br /> parking, sidewalks, decorative street light locations, and locations of possible trees or other <br /> landscape plantings. <br /> Review this layout with the City. Make any necessary adjustments. <br /> 14. Due to the disturbance involved, the City and construction Contractor will need to obtain a <br /> National Pollution Discharge Elimination System (NPDES) General Stormwater Permit from <br /> the Minnesota Pollution Control Agency (MPCA). We will prepare also a Stormwater <br /> Pollution Prevention Plan (SWPPP). <br /> 15. Prepare construction drawings, including typical sections, plans, profiles, details, erosion <br /> control sheets, work zone traffic control sheets, and cross sections as needed. <br /> 16. Prepare construction specifications/Contract Manual. <br /> N•\Marketing Dept\Proposals\00 Letter Proposals12019 Letter Proposal\Pequot Lakes-20190227-3-Rasmussen Rd Design.docx <br />