Laserfiche WebLink
Safetv& Training: <br /> - MMUA Monthly Safety Training(2)—CPR/AED/lst Aid & Annual Safety Plan updates. <br /> Other: <br /> - City message sign notifications modified multiple times. <br /> - Flags maintained as directed (Peace Officers Day& Memorial Day). <br /> - Repaired ropes on 2 flag poles (Chamber& Cole). <br /> - Tree cutting and removal (emergency&preventative by staff, contracted on ROW& Cemetery). <br /> - Vehicle repair('03 F350 & '08 F350)ball joints &tie rods. <br /> - Concerted lawncare efforts for Cemetery before Memorial Day. <br /> - Staff 6-month review. <br /> - Council meeting&prep. <br /> - 911 sign installations (3). <br /> - Team Leadership meetings. <br /> - PRASD contract renewal meeting. <br /> - GIS meeting with WSN. <br /> Compiled and submitted by Jason Gorr—Pequot Lakes Public Works Director <br /> Please direct questions to: (612)810-9478 or jgorr@pequotlakes-mn.gov <br /> Water Dept. <br /> Facility Performance for Aqril 2019: <br /> Flow <br /> Average daily gallons pumped: 80,000 gallons <br /> Maximum daily gallons pumped: 111,000 gallons <br /> Minimum daily gallons pumped: 57,000 gallons <br /> Total monthly gallons pumped: 2,328,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.30 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.64 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Deqt. <br /> Facility Performance for Apri12019: <br /> Flow <br /> Average Daily Flow: 61,035 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 68,409 gallons <br /> Minimum Daily Flow: 52,570 gallons <br /> Total Monthly Flow: 1,831,035 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday, Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance (check amps, clean floats, inspect wet well, etc) was <br /> completed on 5/22. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 5/22. <br />