My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
06-04-2019 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 12:26:59 PM
Creation date
5/30/2019 12:26:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6) Monthly fluoride report was submitted to Minnesota Department of Health on 5/1. <br /> 7) Monthly Discharge Monitoring Report was submitted to MPCA on 5/1. <br /> 8) Total Control Systems will be wrapping up their work on the process control system at <br /> the City's water treatment plant on 5/21. <br /> 9) Dechantel Excavating repaired a bad water service line at a business on Engen Road. <br /> 10)The City's wastewater spray irrigation system is up and running. <br /> 11)Jake Freeman and I replaced a bad water service valve on Brown Street in early May. <br /> 12)With the frost finally out and lots of digging taking place there has been a lot of utility <br /> locating around town. <br /> Water/WW Report respectfully submitted by Andrew Schwartz, Operations Manager, <br /> Pine River Area Sanitary District <br /> Please call cell 320-232-5787 with any questions/concerns or 24-hour emergency at 218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.